A platform for research: civil engineering, architecture and urbanism
BOLT FASTENING PEDESTAL AND CONNECTING STRUCTURE OF GUARDRAIL FOUNDATION BLOCK
PROBLEM TO BE SOLVED: To provide a bolt fastening pedestal in which a filler can be filled into a bolt hole of a member to be fastened without causing air stay, and a connecting structure of a guardrail foundation block.SOLUTION: In a pedestal A, a bolt penetration hole 51 is formed, and air release grooves 52 reaching a side face from the penetration hole 51 are formed at a lower face. A guardrail foundation block F comprises fastening walls 40 each having a bolt hole 41, a bolt b is inserted into the bolt hole 41, a nut n is fastened to an end part of the bolt b via the pedestal A, and a filler f is filled into a space between the fastening walls 40. When filling the filler f into the bolt hole 41, air can be released via air release grooves 52. The filler F can be filled without causing air stay in the bolt hole 41, and the rigidity of a connecting part can be enhanced.
【課題】被締結部材のボルト孔にエア溜まりが生じることなく充填材を充填できるボルト締結用の台座、およびガードレール基礎ブロックの連結構造を提供する。【解決手段】台座Aは、ボルト用の挿通孔51が形成されており、下面に挿通孔51から側面に達するエア抜き用溝52が形成されている。ガードレール基礎ブロックFは、ボルト孔41を有する締結壁40を備え、ボルト孔41にボルトbが通されており、ボルトbの端部に台座Aを介してナットnが締結されており、締結壁40の間の空間に充填材fが充填されている。ボルト孔41に充填材fを充填する際に、エア抜き用溝52を介してエア抜きをすることができる。ボルト孔41にエア溜まりが生じることなく充填材fを充填でき、連結部の強度を高めることができる。【選択図】図5
BOLT FASTENING PEDESTAL AND CONNECTING STRUCTURE OF GUARDRAIL FOUNDATION BLOCK
PROBLEM TO BE SOLVED: To provide a bolt fastening pedestal in which a filler can be filled into a bolt hole of a member to be fastened without causing air stay, and a connecting structure of a guardrail foundation block.SOLUTION: In a pedestal A, a bolt penetration hole 51 is formed, and air release grooves 52 reaching a side face from the penetration hole 51 are formed at a lower face. A guardrail foundation block F comprises fastening walls 40 each having a bolt hole 41, a bolt b is inserted into the bolt hole 41, a nut n is fastened to an end part of the bolt b via the pedestal A, and a filler f is filled into a space between the fastening walls 40. When filling the filler f into the bolt hole 41, air can be released via air release grooves 52. The filler F can be filled without causing air stay in the bolt hole 41, and the rigidity of a connecting part can be enhanced.
【課題】被締結部材のボルト孔にエア溜まりが生じることなく充填材を充填できるボルト締結用の台座、およびガードレール基礎ブロックの連結構造を提供する。【解決手段】台座Aは、ボルト用の挿通孔51が形成されており、下面に挿通孔51から側面に達するエア抜き用溝52が形成されている。ガードレール基礎ブロックFは、ボルト孔41を有する締結壁40を備え、ボルト孔41にボルトbが通されており、ボルトbの端部に台座Aを介してナットnが締結されており、締結壁40の間の空間に充填材fが充填されている。ボルト孔41に充填材fを充填する際に、エア抜き用溝52を介してエア抜きをすることができる。ボルト孔41にエア溜まりが生じることなく充填材fを充填でき、連結部の強度を高めることができる。【選択図】図5
BOLT FASTENING PEDESTAL AND CONNECTING STRUCTURE OF GUARDRAIL FOUNDATION BLOCK
ボルト締結用の台座、およびガードレール基礎ブロックの連結構造
MATSUYAMA TETSUYA (author) / KAMEYAMA TAKESHI (author) / FUJIOKA MASAHIRO (author) / HOSOKAWA KYOHEI (author)
2015-11-24
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2022
|European Patent Office | 2022
|European Patent Office | 2020
|European Patent Office | 2022
|