SCAFFOLD FOR WORK AND INSTALLATION METHOD THEREFOR
PROBLEM TO BE SOLVED: To provide a scaffold for work and an installation method therefor, the scaffold for work allowing installation and removal in a short period of time, allowing removal immediately before stormy weather and therefore reducing damages caused by the stormy weather, facilitating work scheduling and accelerating work progress, thereby curtailing the period for entire work processes, and allowing inspection and repair work without waiting for long consecutive holidays.SOLUTION: A scaffold for work comprises: a scaffold body 100 made by detachably connecting a plurality of floating blocks 1 in a longitudinal direction and connecting a plurality of the floating blocks 1 in a lateral direction with a detachable connecting member in between, the floating block 1 being of a hollow box form and made of an aluminum alloy, and having symmetrical front and rear parts and symmetrical right and left parts; hand rails 31a to 31c installed detachably on an outer peripheral side on a top surface of the scaffold body; and connecting corridors 32a to 32c installed detachably so as to cover an opening above the part between the floating blocks 1 connected in the lateral direction.
【課題】短時間で設置・撤去でき、荒天直前の撤去が可能となって荒天による破損が減少し、作業日程の調整が容易となり作業の進捗を早めて作業全工程の時間を短縮でき、大型連休等を待たずに点検・補修作業が行える作業用足場及びその設置方法を提供する。【解決手段】中空箱状をなし前後部及び左右部の形状が各々対称に形成されたアルミニウム合金製の浮体ブロック1を、前後方向に複数個着脱自在に連結すると共に、浮体ブロック1を、左右方向に着脱自在の連結材を介して複数個連結してなる作業用足場本体100と、この作業用足場本体の上面の外周側に着脱自在に設けられる手すり31a〜31cと、左右方向に位置する浮体ブロック1相互間の上部開口を塞ぐように着脱自在に設けられる渡り廊下32a〜32cとによって作業用足場を構成した。【選択図】図1
SCAFFOLD FOR WORK AND INSTALLATION METHOD THEREFOR
PROBLEM TO BE SOLVED: To provide a scaffold for work and an installation method therefor, the scaffold for work allowing installation and removal in a short period of time, allowing removal immediately before stormy weather and therefore reducing damages caused by the stormy weather, facilitating work scheduling and accelerating work progress, thereby curtailing the period for entire work processes, and allowing inspection and repair work without waiting for long consecutive holidays.SOLUTION: A scaffold for work comprises: a scaffold body 100 made by detachably connecting a plurality of floating blocks 1 in a longitudinal direction and connecting a plurality of the floating blocks 1 in a lateral direction with a detachable connecting member in between, the floating block 1 being of a hollow box form and made of an aluminum alloy, and having symmetrical front and rear parts and symmetrical right and left parts; hand rails 31a to 31c installed detachably on an outer peripheral side on a top surface of the scaffold body; and connecting corridors 32a to 32c installed detachably so as to cover an opening above the part between the floating blocks 1 connected in the lateral direction.
【課題】短時間で設置・撤去でき、荒天直前の撤去が可能となって荒天による破損が減少し、作業日程の調整が容易となり作業の進捗を早めて作業全工程の時間を短縮でき、大型連休等を待たずに点検・補修作業が行える作業用足場及びその設置方法を提供する。【解決手段】中空箱状をなし前後部及び左右部の形状が各々対称に形成されたアルミニウム合金製の浮体ブロック1を、前後方向に複数個着脱自在に連結すると共に、浮体ブロック1を、左右方向に着脱自在の連結材を介して複数個連結してなる作業用足場本体100と、この作業用足場本体の上面の外周側に着脱自在に設けられる手すり31a〜31cと、左右方向に位置する浮体ブロック1相互間の上部開口を塞ぐように着脱自在に設けられる渡り廊下32a〜32cとによって作業用足場を構成した。【選択図】図1
SCAFFOLD FOR WORK AND INSTALLATION METHOD THEREFOR
作業用足場及びその設置方法
KITAHATA TAKASHI (author) / MIYAKE SATOSHI (author) / AIDA KAZUYA (author)
2015-12-21
Patent
Electronic Resource
Japanese
SCAFFOLD DEVICE FOR WORK FOR ESCALATOR AND INSTALLATION METHOD OF SCAFFOLD FOR WORK
European Patent Office | 2019
|SCAFFOLD INSTALLATION METHOD AND SCAFFOLD INSTALLATION STRUCTURE
European Patent Office | 2019
|SCAFFOLD DEVICE AND INSTALLATION METHOD OF SCAFFOLD DEVICE
European Patent Office | 2018
|