A platform for research: civil engineering, architecture and urbanism
MONORAIL VEHICLE
PROBLEM TO BE SOLVED: To provide a monorail vehicle capable of suppressing falling of compacted snow or the like on a track beam below the track beam.SOLUTION: Snow melting agents sprayed to the upper surface of a track beam during snow falling are stored in a tank 9 provided in the upper roof structure supporting a middle vehicle, and the lower roof structure of the tank 9 is opened so as to be penetrated by the upper end of a grip rod 12. A spray pipe 52 for spraying the snow melting agents stored in the tank 9 to the upper surface of the track beam is connected to the lower end of the grip 12, and the spray pipe 52 extends through a frame 20, a cap beam 21, and a center pin 40 to over the track beam. The lower end of the spray pipe 52 includes a spray amount adjusting part 14 for adjusting the spray amount of the snow melting agents to be sprayed.SELECTED DRAWING: Figure 3
【課題】軌道桁上面の圧雪等を軌道桁の下方に落下することを抑制できるモノレール車両を提供する。【解決手段】中間車両を支持する台車の上方の屋根構体に備えられたタンク9には、降雪時に軌道桁の上面に散布される融雪剤が貯蔵され、タンク9の下方の屋根構体は、握り棒12の上端部が貫通できるように開口されている。握り棒12の下端部には、タンク9に貯蔵された融雪剤を軌道桁の上面に散布する散布管52が接続され、散布管52は、台枠20、枕梁21、および、中心ピン40を貫通して、軌道桁の上方まで延伸している。散布管52の下端部には、散布される融雪剤の散布量を調整する散布量調整部14が備えられる。【選択図】図3
MONORAIL VEHICLE
PROBLEM TO BE SOLVED: To provide a monorail vehicle capable of suppressing falling of compacted snow or the like on a track beam below the track beam.SOLUTION: Snow melting agents sprayed to the upper surface of a track beam during snow falling are stored in a tank 9 provided in the upper roof structure supporting a middle vehicle, and the lower roof structure of the tank 9 is opened so as to be penetrated by the upper end of a grip rod 12. A spray pipe 52 for spraying the snow melting agents stored in the tank 9 to the upper surface of the track beam is connected to the lower end of the grip 12, and the spray pipe 52 extends through a frame 20, a cap beam 21, and a center pin 40 to over the track beam. The lower end of the spray pipe 52 includes a spray amount adjusting part 14 for adjusting the spray amount of the snow melting agents to be sprayed.SELECTED DRAWING: Figure 3
【課題】軌道桁上面の圧雪等を軌道桁の下方に落下することを抑制できるモノレール車両を提供する。【解決手段】中間車両を支持する台車の上方の屋根構体に備えられたタンク9には、降雪時に軌道桁の上面に散布される融雪剤が貯蔵され、タンク9の下方の屋根構体は、握り棒12の上端部が貫通できるように開口されている。握り棒12の下端部には、タンク9に貯蔵された融雪剤を軌道桁の上面に散布する散布管52が接続され、散布管52は、台枠20、枕梁21、および、中心ピン40を貫通して、軌道桁の上方まで延伸している。散布管52の下端部には、散布される融雪剤の散布量を調整する散布量調整部14が備えられる。【選択図】図3
MONORAIL VEHICLE
モノレール車両
CHIBA TOMOYA (author) / HARADA EIJI (author) / TAKAHASHI MITSURU (author)
2016-04-11
Patent
Electronic Resource
Japanese
IPC:
B61K
Andere Hilfseinrichtungen für Eisenbahnen
,
OTHER AUXILIARY EQUIPMENT FOR RAILWAYS
/
B61B
RAILWAY SYSTEMS
,
Eisenbahnanlagen
/
B61F
Untergestelle für Schienenfahrzeuge, z.B. Fahrgestellrahmen, Drehgestelle oder Anordnungen der Radsätze
,
RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES
/
E01B
PERMANENT WAY
,
Gleisoberbau
/
E01H
STREET CLEANING
,
Reinigen von Straßen
monorail vehicle for firefighting and rail structure for monorail
European Patent Office | 2024
|