A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide an excavator and an excavation method capable of reducing quantity of bentonite used when excavating a pile hole.SOLUTION: While rotatably pressing a casing 1 having an injection pipe 2 for injecting a bentonite liquid on an outer peripheral surface, in which the injection pipe 2 has a jetting nozzle 4 for jetting the bentonite liquid in the direction along the outer peripheral surface, in soil while jetting the bentonite liquid from the jetting nozzle 4 by injecting the bentonite liquid into the injection pipe 2, soil in the casing 1 is excavated and removed. A clearance corresponding to a projection width of the injection pipe 2 is formed between the casing 1 and a pile hole wall by rotation of the casing 1, and the bentonite liquid is injected only into this clearance, and is mixed with the soil of a pile hole wall surface, and becomes bentonite-mixed soil of a sticky state, and forms a protective layer for preventing collapse of the pile hole wall. When extracting the casing 1, since the bentonite-mixed soil of the sticky state exists between the casing 1 and the pile hole wall, the casing 1 can be easily extracted.SELECTED DRAWING: Figure 1
【課題】杭孔を掘削する際に使用するベントナイトの量を減らすことが可能な掘削装置および掘削方法の提供。【解決手段】外周面にベントナイト液が注入される注入管2を備え、注入管2が外周面に沿う方向にベントナイト液を噴出する噴出口4を備えたケーシング1を、注入管2にベントナイト液を注入して噴出口4からベントナイト液を噴出させながら土壌中に回転圧入しつつ、ケーシング1内の土壌を掘削および排土する。ケーシング1と杭孔壁との間にはケーシング1の回転により注入管2の突出幅に応じた隙間が形成され、この隙間にのみベントナイト液が注入され、杭孔壁面の土壌と混ざり合い、ドロドロの状態のベントナイト混合土となり、杭孔壁の崩落を防止する保護層を形成する。ケーシング1の引き抜き時には、ケーシング1と杭孔壁との間にドロドロの状態のベントナイト混合土が存在するため、ケーシング1を容易に引き抜くことができる。【選択図】図1
PROBLEM TO BE SOLVED: To provide an excavator and an excavation method capable of reducing quantity of bentonite used when excavating a pile hole.SOLUTION: While rotatably pressing a casing 1 having an injection pipe 2 for injecting a bentonite liquid on an outer peripheral surface, in which the injection pipe 2 has a jetting nozzle 4 for jetting the bentonite liquid in the direction along the outer peripheral surface, in soil while jetting the bentonite liquid from the jetting nozzle 4 by injecting the bentonite liquid into the injection pipe 2, soil in the casing 1 is excavated and removed. A clearance corresponding to a projection width of the injection pipe 2 is formed between the casing 1 and a pile hole wall by rotation of the casing 1, and the bentonite liquid is injected only into this clearance, and is mixed with the soil of a pile hole wall surface, and becomes bentonite-mixed soil of a sticky state, and forms a protective layer for preventing collapse of the pile hole wall. When extracting the casing 1, since the bentonite-mixed soil of the sticky state exists between the casing 1 and the pile hole wall, the casing 1 can be easily extracted.SELECTED DRAWING: Figure 1
【課題】杭孔を掘削する際に使用するベントナイトの量を減らすことが可能な掘削装置および掘削方法の提供。【解決手段】外周面にベントナイト液が注入される注入管2を備え、注入管2が外周面に沿う方向にベントナイト液を噴出する噴出口4を備えたケーシング1を、注入管2にベントナイト液を注入して噴出口4からベントナイト液を噴出させながら土壌中に回転圧入しつつ、ケーシング1内の土壌を掘削および排土する。ケーシング1と杭孔壁との間にはケーシング1の回転により注入管2の突出幅に応じた隙間が形成され、この隙間にのみベントナイト液が注入され、杭孔壁面の土壌と混ざり合い、ドロドロの状態のベントナイト混合土となり、杭孔壁の崩落を防止する保護層を形成する。ケーシング1の引き抜き時には、ケーシング1と杭孔壁との間にドロドロの状態のベントナイト混合土が存在するため、ケーシング1を容易に引き抜くことができる。【選択図】図1
EXCAVATOR AND EXCAVATION METHOD
掘削装置および掘削方法
MATSUSHITA SEIJI (author)
2016-04-21
Patent
Electronic Resource
Japanese
EXCAVATOR, CONTROL METHOD FOR EXCAVATOR, AND EXCAVATION SYSTEM
European Patent Office | 2016
|EXCAVATOR, INSTALLATION METHOD OF EXCAVATOR, AND GROUND EXCAVATION METHOD
European Patent Office | 2020
|