A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a fitting device of a brace capable of stably and surely fixing a brace upper end part installation metal fitting to a suspension bolt.SOLUTION: A brace upper end part installation metal fitting 3 of a brace fitting device comprises a first metal fitting 11 formed in a plan view substantially U shape, a cam 9 arranged between both side plate parts of the first metal fitting 11, connection means 10 for rotatably connecting these by penetrating through both side plate parts of the first metal fitting 11, both sandwiching plate parts of the second metal fitting 12 and the cam 9, and a brace fitting bolt 13 screwed in a screw hole 17 provided in a connection part of the second metal fitting 12, rushing one end part side in-between both sandwiching plate parts and fitting the other end part side to an upper end part of a brace 2, and the first metal fitting 11, the second metal fitting 12 and the cam 9 are respectively composed of a die cast.SELECTED DRAWING: Figure 7
【課題】筋交い上端部取付金具を吊りボルトに対し安定良く確実に固定させることのできる筋交いの取付装置を提供する。【解決手段】筋交いの取付装置の筋交い上端部取付金具3は、平面視略コ字状に形成された第一金具11と、第一金具11の両側板部間に配置されるカム9と、第一金具11の両側板部と第二金具12の両挟持板部とカム9とを貫通してこれらを回動可能に連結する連結手段10と、第二金具12のつなぎ部に設けたネジ孔17に螺入され、一端部側が両挟持板部間に突入され且つ他端部側が筋交い2の上端部に取り付けられる筋交い取付用ボルト13とを備えてなるもので、第一金具11、第二金具12及びカム9は夫々ダイキャストからなる。【選択図】図7
PROBLEM TO BE SOLVED: To provide a fitting device of a brace capable of stably and surely fixing a brace upper end part installation metal fitting to a suspension bolt.SOLUTION: A brace upper end part installation metal fitting 3 of a brace fitting device comprises a first metal fitting 11 formed in a plan view substantially U shape, a cam 9 arranged between both side plate parts of the first metal fitting 11, connection means 10 for rotatably connecting these by penetrating through both side plate parts of the first metal fitting 11, both sandwiching plate parts of the second metal fitting 12 and the cam 9, and a brace fitting bolt 13 screwed in a screw hole 17 provided in a connection part of the second metal fitting 12, rushing one end part side in-between both sandwiching plate parts and fitting the other end part side to an upper end part of a brace 2, and the first metal fitting 11, the second metal fitting 12 and the cam 9 are respectively composed of a die cast.SELECTED DRAWING: Figure 7
【課題】筋交い上端部取付金具を吊りボルトに対し安定良く確実に固定させることのできる筋交いの取付装置を提供する。【解決手段】筋交いの取付装置の筋交い上端部取付金具3は、平面視略コ字状に形成された第一金具11と、第一金具11の両側板部間に配置されるカム9と、第一金具11の両側板部と第二金具12の両挟持板部とカム9とを貫通してこれらを回動可能に連結する連結手段10と、第二金具12のつなぎ部に設けたネジ孔17に螺入され、一端部側が両挟持板部間に突入され且つ他端部側が筋交い2の上端部に取り付けられる筋交い取付用ボルト13とを備えてなるもので、第一金具11、第二金具12及びカム9は夫々ダイキャストからなる。【選択図】図7
FITTING DEVICE OF BRACE
筋交いの取付装置
SAWADA MISAO (author)
2016-04-21
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS