A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR CONCRETE FLOOR SLAB OF OVERPASS
PROBLEM TO BE SOLVED: To provide a construction method for a concrete floor slab of an overpass which, when introducing pre-stress in between two precast concrete slabs for constructing a PC floor slab, easily manages an installation height position of the precast concrete slabs.SOLUTION: A connection protrusion 50 is formed integrally on a connection edge part of a precast concrete slab 23, and a connection recess 51 is formed integrally on a connection edge part of another precast concrete slab 43. A guide pin 55 made of a material having a lateral elastic coefficient lower than that of concrete is made to protrude on a connection edge surface of the precast concrete slab 43, and the guide pin 55 is inserted into a guide hole part 54 opened in a connection edge surface of the other precast concrete slab 23. The connection protrusion 50 is thereby guided into the connection recess 51, and the precast concrete slabs 23, 43 are guided to a desired location and installed, thus constructing a concrete floor slab 20.SELECTED DRAWING: Figure 1
【課題】両プレキャストコンクリート版間にプレストレスを導入してPC床版を構築するに際し、プレキャストコンクリート版の設置高さ位置の管理を容易に行える高架道路用コンクリート床版の構築方法の提供。【解決手段】プレキャストコンクリート版23の接合端部に接合凸部50を一体に備えるとともに、他方のプレキャストコンクリート版43の接合端部に接合凹部51を一体に形成し、一方のプレキャストコンクリート版43の接合端面に、コンクリートに比べて横弾性係数の低い材料からなるガイドピン55を突出させておき、他方のプレキャストコンクリート版23の接合端面に開口したガイド穴部54にガイドピン55を挿入することにより、接合凸部50を接合凹部51内に案内させるとともに、両プレキャストコンクリート版23,43を所望の位置に案内させて設置することによりコンクリート床版20を構築する。【選択図】図1
CONSTRUCTION METHOD FOR CONCRETE FLOOR SLAB OF OVERPASS
PROBLEM TO BE SOLVED: To provide a construction method for a concrete floor slab of an overpass which, when introducing pre-stress in between two precast concrete slabs for constructing a PC floor slab, easily manages an installation height position of the precast concrete slabs.SOLUTION: A connection protrusion 50 is formed integrally on a connection edge part of a precast concrete slab 23, and a connection recess 51 is formed integrally on a connection edge part of another precast concrete slab 43. A guide pin 55 made of a material having a lateral elastic coefficient lower than that of concrete is made to protrude on a connection edge surface of the precast concrete slab 43, and the guide pin 55 is inserted into a guide hole part 54 opened in a connection edge surface of the other precast concrete slab 23. The connection protrusion 50 is thereby guided into the connection recess 51, and the precast concrete slabs 23, 43 are guided to a desired location and installed, thus constructing a concrete floor slab 20.SELECTED DRAWING: Figure 1
【課題】両プレキャストコンクリート版間にプレストレスを導入してPC床版を構築するに際し、プレキャストコンクリート版の設置高さ位置の管理を容易に行える高架道路用コンクリート床版の構築方法の提供。【解決手段】プレキャストコンクリート版23の接合端部に接合凸部50を一体に備えるとともに、他方のプレキャストコンクリート版43の接合端部に接合凹部51を一体に形成し、一方のプレキャストコンクリート版43の接合端面に、コンクリートに比べて横弾性係数の低い材料からなるガイドピン55を突出させておき、他方のプレキャストコンクリート版23の接合端面に開口したガイド穴部54にガイドピン55を挿入することにより、接合凸部50を接合凹部51内に案内させるとともに、両プレキャストコンクリート版23,43を所望の位置に案内させて設置することによりコンクリート床版20を構築する。【選択図】図1
CONSTRUCTION METHOD FOR CONCRETE FLOOR SLAB OF OVERPASS
高架道路用コンクリート床版の構築方法
MISHIMA KOZO (author) / OYANAGI SHUICHI (author) / KAWAMURA NAOHIKO (author) / OBAYASHI ATSUHIRO (author) / AOKI KEIICHI (author) / WADA YOSHINORI (author)
2016-05-30
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
CONCRETE FLOOR SLAB REMOVAL METHOD AND CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2018
|LIGHTWEIGHT CONCRETE FLOOR SLAB AND LIGHTWEIGHT CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2023
|Construction method and construction device of concrete floor slab and concrete floor slab
European Patent Office | 2023
|