A platform for research: civil engineering, architecture and urbanism
CO-SETTLEMENT PREVENTION DEVICE FOR SHEET PILE, AND SHEET PILE INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a device for preventing co-settlement and co-lifting when installing a sheet pile, the device reducing burdens regarding work and time, saving materials, enhancing workability and enabling high-quality installation work, along with a sheet pile installation method using the device.SOLUTION: A co-settlement prevention device for a sheet pile includes: a beam-like pedestal part (2); a first clamp part (1a) fitted on an end of the pedestal part (2) for holding a top edge of an existing sheet pile (P4) adjacent to a sheet pile (P5) being driven in or pulled out; and a second clamp part (1b) fitted on the other end of the pedestal part (2) for holding the top edge of at least one existing sheet pile (P4) other than the sheet pile (P4) being held by the first clamp part (1a).SELECTED DRAWING: Figure 2
【課題】矢板の施工において共下がり及び共上がりを防止するための装置であって、作業や時間の負担が少なく、資材を無駄にせず、かつ、施工性が向上し高品質の施工を行うことができる装置並びにこれを用いた矢板の施工方法を提供する。【解決手段】梁状の台座部(2)と、台座部(2)の一端部に取り付けられ、打込み又は引抜き中の矢板(P5)の隣に位置する既設の矢板(P4)の天端を把持するための第1のクランプ部(1a)と、台座部(2)の他端部に取り付けられ、前記第1のクランプ部(1a)が把持する矢板(P4)以外の少なくとも1枚の既設の矢板(P4)の天端を把持するための第2のクランプ部(1b)と、を備えた矢板の共下がり防止装置である。【選択図】図2
CO-SETTLEMENT PREVENTION DEVICE FOR SHEET PILE, AND SHEET PILE INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a device for preventing co-settlement and co-lifting when installing a sheet pile, the device reducing burdens regarding work and time, saving materials, enhancing workability and enabling high-quality installation work, along with a sheet pile installation method using the device.SOLUTION: A co-settlement prevention device for a sheet pile includes: a beam-like pedestal part (2); a first clamp part (1a) fitted on an end of the pedestal part (2) for holding a top edge of an existing sheet pile (P4) adjacent to a sheet pile (P5) being driven in or pulled out; and a second clamp part (1b) fitted on the other end of the pedestal part (2) for holding the top edge of at least one existing sheet pile (P4) other than the sheet pile (P4) being held by the first clamp part (1a).SELECTED DRAWING: Figure 2
【課題】矢板の施工において共下がり及び共上がりを防止するための装置であって、作業や時間の負担が少なく、資材を無駄にせず、かつ、施工性が向上し高品質の施工を行うことができる装置並びにこれを用いた矢板の施工方法を提供する。【解決手段】梁状の台座部(2)と、台座部(2)の一端部に取り付けられ、打込み又は引抜き中の矢板(P5)の隣に位置する既設の矢板(P4)の天端を把持するための第1のクランプ部(1a)と、台座部(2)の他端部に取り付けられ、前記第1のクランプ部(1a)が把持する矢板(P4)以外の少なくとも1枚の既設の矢板(P4)の天端を把持するための第2のクランプ部(1b)と、を備えた矢板の共下がり防止装置である。【選択図】図2
CO-SETTLEMENT PREVENTION DEVICE FOR SHEET PILE, AND SHEET PILE INSTALLATION METHOD
矢板の共下がり防止装置及び矢板の施工方法
INOUE TOSHIO (author) / KATO TSUTOMU (author) / SUZUKI YUKICHI (author)
2016-10-06
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE SHEET PILE AND INSTALLATION METHOD OF STEEL PIPE SHEET PILE
European Patent Office | 2020
|SHEET PILE INSTALLATION VIBRATION STUDY
British Library Conference Proceedings | 1995
|