A platform for research: civil engineering, architecture and urbanism
SHEET PILE INSTALLATION METHOD
To provide a sheet pile installation method capable of further improving construction accuracy of sheet pile installation work.SOLUTION: An installation guide jig 1 comprising a guide joint portion 3a capable of fitting into a joint portion 22b on the other side of a sheet pile 20 to be installed is arranged on the other side of an installation target position of the sheet pile 20 to be installed. The installation guide jig 1 is removably fixed to a guide material 6 extending horizontally. Then, the sheet pile 20 to be installed is arranged along the guide material 6. In a state where a joint portion 22a on one side of the sheet pile 20 to be installed is fitted into a joint portion 22b of an existing sheet pile 20 already installed on one side of the installation target position of the sheet pile 20 to be installed and where the joint portion 22b on the other side of the sheet pile 20 to be installed is fitted into the guide joint portion 3a of the installation guide jig 1, the sheet pile 20 to be installed is installed into the ground G.SELECTED DRAWING: Figure 4
【課題】矢板の打設作業の施工精度をより向上させることができる矢板の打設方法を提供する。【解決手段】打設対象の矢板20の他方側の継手部22bに嵌合可能なガイド継手部3aを備えた打設ガイド治具1を、打設対象の矢板20の打設目標位置の他方側に配置して、打設ガイド治具1を水平方向に延設されている導材6に対して着脱可能に固定した状態にする。そして、導材6に沿わせて打設対象の矢板20を配置し、打設対象の矢板20の打設目標位置の一方側に既に打設されている既設の矢板20の継手部22bに打設対象の矢板20の一方側の継手部22aを嵌合させ、打設ガイド治具1のガイド継手部3aに打設対象の矢板20の他方側の継手部22bを嵌合させた状態で、打設対象の矢板20を地盤Gに打設する。【選択図】図4
SHEET PILE INSTALLATION METHOD
To provide a sheet pile installation method capable of further improving construction accuracy of sheet pile installation work.SOLUTION: An installation guide jig 1 comprising a guide joint portion 3a capable of fitting into a joint portion 22b on the other side of a sheet pile 20 to be installed is arranged on the other side of an installation target position of the sheet pile 20 to be installed. The installation guide jig 1 is removably fixed to a guide material 6 extending horizontally. Then, the sheet pile 20 to be installed is arranged along the guide material 6. In a state where a joint portion 22a on one side of the sheet pile 20 to be installed is fitted into a joint portion 22b of an existing sheet pile 20 already installed on one side of the installation target position of the sheet pile 20 to be installed and where the joint portion 22b on the other side of the sheet pile 20 to be installed is fitted into the guide joint portion 3a of the installation guide jig 1, the sheet pile 20 to be installed is installed into the ground G.SELECTED DRAWING: Figure 4
【課題】矢板の打設作業の施工精度をより向上させることができる矢板の打設方法を提供する。【解決手段】打設対象の矢板20の他方側の継手部22bに嵌合可能なガイド継手部3aを備えた打設ガイド治具1を、打設対象の矢板20の打設目標位置の他方側に配置して、打設ガイド治具1を水平方向に延設されている導材6に対して着脱可能に固定した状態にする。そして、導材6に沿わせて打設対象の矢板20を配置し、打設対象の矢板20の打設目標位置の一方側に既に打設されている既設の矢板20の継手部22bに打設対象の矢板20の一方側の継手部22aを嵌合させ、打設ガイド治具1のガイド継手部3aに打設対象の矢板20の他方側の継手部22bを嵌合させた状態で、打設対象の矢板20を地盤Gに打設する。【選択図】図4
SHEET PILE INSTALLATION METHOD
矢板の打設方法
KATAYAMA AKIRA (author) / KURODA KENJI (author) / SAKAKIBARA TSUTOMU (author)
2024-07-04
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SHEET PILE INSTALLATION VIBRATION STUDY
British Library Conference Proceedings | 1995
|STEEL PIPE SHEET PILE AND INSTALLATION METHOD OF STEEL PIPE SHEET PILE
European Patent Office | 2020
|