BEAM MATERIAL LOAD BEARING STRUCTURE AND BEAM MATERIAL REPAIR METHOD
PROBLEM TO BE SOLVED: To provide a beam material load bearing structure and a beam material repair method capable of repairing a beam material without installing a support material, and capable of shortening a construction period.SOLUTION: A beam material load bearing structure 1A for bearing a load acting on a repair object beam material 11 when repairing the repair object beam material 11 to be a repair object, comprises a pair of upper chord materials 2 and 2 supported by support beam materials 12 respectively arranged at an interval on both sides of the repair object beam material 11 in the direction orthogonal to the extension direction of the repair object beam material 11 and joined by crossing with the repair object beam material 11, a pair of lower chord materials respectively arranged under the pair of upper chord materials 2 and 2 and connected to the upper chord materials 2 and 2 for respectively arranging both end parts on the upper side, and bundle materials 4, 4... arranged between the upper chord materials 2 and 2 and the lower chord materials 3 and 3 and joining the upper chord materials 2 and 2 and the lower chord materials 3 and 3.SELECTED DRAWING: Figure 1
【課題】サポート材を設置せずに梁材を修復できるとともに、工期短縮を図ることができる梁材荷重負担構造および梁材修復方法を提供する。【解決手段】修復対象となる修復対象梁材11を修復する際に、修復対象梁材11に作用する荷重を負担する梁材荷重負担構造1Aであって、修復対象梁材11の修復対象梁材11の延在方向に直交する方向の両側に間隔をあけてそれぞれ配置され、修復対象梁材11と交差して接合された支持梁材12に支持された一対の上弦材2,2と、一対の上弦材2,2の下方にそれぞれ配置され、両端部がそれぞれ上側に配置される上弦材2,2に連結された一対の下弦材と、上弦材2,2と下弦材3,3との間に配置され、上弦材2,2と下弦材3,3とを接合する束材4,4…と、を有する。【選択図】図1
BEAM MATERIAL LOAD BEARING STRUCTURE AND BEAM MATERIAL REPAIR METHOD
PROBLEM TO BE SOLVED: To provide a beam material load bearing structure and a beam material repair method capable of repairing a beam material without installing a support material, and capable of shortening a construction period.SOLUTION: A beam material load bearing structure 1A for bearing a load acting on a repair object beam material 11 when repairing the repair object beam material 11 to be a repair object, comprises a pair of upper chord materials 2 and 2 supported by support beam materials 12 respectively arranged at an interval on both sides of the repair object beam material 11 in the direction orthogonal to the extension direction of the repair object beam material 11 and joined by crossing with the repair object beam material 11, a pair of lower chord materials respectively arranged under the pair of upper chord materials 2 and 2 and connected to the upper chord materials 2 and 2 for respectively arranging both end parts on the upper side, and bundle materials 4, 4... arranged between the upper chord materials 2 and 2 and the lower chord materials 3 and 3 and joining the upper chord materials 2 and 2 and the lower chord materials 3 and 3.SELECTED DRAWING: Figure 1
【課題】サポート材を設置せずに梁材を修復できるとともに、工期短縮を図ることができる梁材荷重負担構造および梁材修復方法を提供する。【解決手段】修復対象となる修復対象梁材11を修復する際に、修復対象梁材11に作用する荷重を負担する梁材荷重負担構造1Aであって、修復対象梁材11の修復対象梁材11の延在方向に直交する方向の両側に間隔をあけてそれぞれ配置され、修復対象梁材11と交差して接合された支持梁材12に支持された一対の上弦材2,2と、一対の上弦材2,2の下方にそれぞれ配置され、両端部がそれぞれ上側に配置される上弦材2,2に連結された一対の下弦材と、上弦材2,2と下弦材3,3との間に配置され、上弦材2,2と下弦材3,3とを接合する束材4,4…と、を有する。【選択図】図1
BEAM MATERIAL LOAD BEARING STRUCTURE AND BEAM MATERIAL REPAIR METHOD
梁材荷重負担構造および梁材修復方法
MAEDA NOBUYUKI (author) / ABE HIDESUKE (author) / OSUGA YOSHIO (author) / KIYONARI SHIN (author)
2017-01-19
Patent
Electronic Resource
Japanese
ASSEMBLY MATERIAL, CHANNEL MATERIAL, LOAD BEARING WALL, TRUSS BEAM, AND BEAM
European Patent Office | 2020
|STEEL BEAM MATERIAL CONSTRUCTION METHOD AND STEEL BEAM MATERIAL JUNCTION STRUCTURE
European Patent Office | 2022
|ASSEMBLY MATERIAL, SHAPED STEEL, TRUSS BEAM, BEARING WALL, AND BEAM
European Patent Office | 2021
|