A platform for research: civil engineering, architecture and urbanism
STEEL BEAM MATERIAL CONSTRUCTION METHOD AND STEEL BEAM MATERIAL JUNCTION STRUCTURE
To improve workability of a junction of a pair of steel beam materials while restricting a cracking of a slab with a shrinkage.SOLUTION: A steel beam material construction method comprises: a preceding concrete installation process of installing a pre-installation concrete 40A of a slab 40 on one bracket 20A and a central beam 30 leaving a post-installation strip R2 in the state where bolts 54, 58 penetrated into bolt holes 28, 38 formed at webs 26, 36 and bolt holes 52, 56 formed at a splice plate 50 and as a horizontal long hole extending in a material axis direction of a central beam 30 are temporarily fastened; and a weldment process of welding the webs 26, 36 and the splice plate 50 by a weldment part W extending in a vertical direction after curing of the pre-installation concrete 40A installed on the one bracket 20A and the central beam 30.SELECTED DRAWING: Figure 5
【課題】収縮に伴うスラブのひび割れを抑制しつつ、一対の鉄骨梁材の接合部の施工性を向上することを目的とする。【解決手段】鉄骨梁材施工方法は、ウェブ26,36に形成されたボルト孔28,38、及びスプライスプレート50に形成され、中央梁30の材軸方向に延びる横長孔とされたボルト孔52,56に貫通されたボルト54,58を仮締めした状態で、後打ち帯R2を残して一方のブラケット20A及び中央梁30上にスラブ40の先打ちコンクリート40Aを打設する先行コンクリート打設工程と、一方のブラケット20A及び中央梁30上に打設された先打ちコンクリート40Aの硬化後、ウェブ26,36、及びスプライスプレート50を、上下方向に延びる溶接部Wによって溶接する溶接工程と、を備える。【選択図】図5
STEEL BEAM MATERIAL CONSTRUCTION METHOD AND STEEL BEAM MATERIAL JUNCTION STRUCTURE
To improve workability of a junction of a pair of steel beam materials while restricting a cracking of a slab with a shrinkage.SOLUTION: A steel beam material construction method comprises: a preceding concrete installation process of installing a pre-installation concrete 40A of a slab 40 on one bracket 20A and a central beam 30 leaving a post-installation strip R2 in the state where bolts 54, 58 penetrated into bolt holes 28, 38 formed at webs 26, 36 and bolt holes 52, 56 formed at a splice plate 50 and as a horizontal long hole extending in a material axis direction of a central beam 30 are temporarily fastened; and a weldment process of welding the webs 26, 36 and the splice plate 50 by a weldment part W extending in a vertical direction after curing of the pre-installation concrete 40A installed on the one bracket 20A and the central beam 30.SELECTED DRAWING: Figure 5
【課題】収縮に伴うスラブのひび割れを抑制しつつ、一対の鉄骨梁材の接合部の施工性を向上することを目的とする。【解決手段】鉄骨梁材施工方法は、ウェブ26,36に形成されたボルト孔28,38、及びスプライスプレート50に形成され、中央梁30の材軸方向に延びる横長孔とされたボルト孔52,56に貫通されたボルト54,58を仮締めした状態で、後打ち帯R2を残して一方のブラケット20A及び中央梁30上にスラブ40の先打ちコンクリート40Aを打設する先行コンクリート打設工程と、一方のブラケット20A及び中央梁30上に打設された先打ちコンクリート40Aの硬化後、ウェブ26,36、及びスプライスプレート50を、上下方向に延びる溶接部Wによって溶接する溶接工程と、を備える。【選択図】図5
STEEL BEAM MATERIAL CONSTRUCTION METHOD AND STEEL BEAM MATERIAL JUNCTION STRUCTURE
鉄骨梁材施工方法、及び鉄骨梁材接合構造
MINAMITANI TOMOKI (author) / TSUTAKABE JUNICHIRO (author)
2022-12-27
Patent
Electronic Resource
Japanese
STEEL-WOOD HYBRID BEAM MATERIAL AND BEAM MATERIAL T-SHAPED STEEL PIECE
European Patent Office | 2023
|CONSTRUCTION METHOD OF JUNCTION STRUCTURE OF REINFORCED CONCRETE COLUMN AND STEEL BEAM
European Patent Office | 2024
|