A platform for research: civil engineering, architecture and urbanism
ASSEMBLY MATERIAL, CHANNEL MATERIAL, LOAD BEARING WALL, TRUSS BEAM, AND BEAM
To provide an assembly material obtained by assembling a set of channel materials which can maintain an assembly state of the set of channel materials without using a joint component.SOLUTION: An assembly material 20 is an assembly material obtained by assembling a set of channel materials 20 and 21, in which the channel materials 20 and 21 has web parts 22 and 23, first flange parts 24 and 25, second flange parts 26 and 27 having extension lengths longer than the first flange parts 24 and 25, first lip parts 28 and 29, second lip parts 30 and 31, first projections 32 and 33 formed in the second lip parts 30 and 31, and first recesses 34 and 35 formed in the web parts 22 and 23, the first flange part side of the channel material 21 is fit into the recess of the channel material 20 and the first flange part side of the channel material 20 is fit into the recess of the channel material 21, and the first projection 32 of the channel material 20 is fit into the first recess 34 thereof and the first projection 33 of the channel material 21 is fit into the first recess 35 thereof.SELECTED DRAWING: Figure 1
【課題】一組のチャンネル材を組み立てた組立材において、接合部品を用いなくても、一組のチャンネル材の組立状態を維持できる組立材を提供する。【解決手段】組立材20は、一組のチャンネル材20,21を組み立てた組立材であり、チャンネル材20,21は、ウェブ部22,23と、第1フランジ部24,25と、第1フランジ部24,25よりも延出長さが長い第2フランジ部26,27と、第1リップ部28,29と、第2リップ部30,31と、第2リップ部30,31に形成された第1凸部32,33と、ウェブ部22,23に形成された第1凹部34,35と、を有し、チャンネル材20の凹状部にチャンネル材21の第1フランジ部側が嵌合すると共にチャンネル材21の凹状部にチャンネル材20の第1フランジ部側が嵌合し、チャンネル材20の第1凸部32及び第1凹部34と、チャンネル材21の第1凹部35及び第1凸部33とがそれぞれ係合している。【選択図】図1
ASSEMBLY MATERIAL, CHANNEL MATERIAL, LOAD BEARING WALL, TRUSS BEAM, AND BEAM
To provide an assembly material obtained by assembling a set of channel materials which can maintain an assembly state of the set of channel materials without using a joint component.SOLUTION: An assembly material 20 is an assembly material obtained by assembling a set of channel materials 20 and 21, in which the channel materials 20 and 21 has web parts 22 and 23, first flange parts 24 and 25, second flange parts 26 and 27 having extension lengths longer than the first flange parts 24 and 25, first lip parts 28 and 29, second lip parts 30 and 31, first projections 32 and 33 formed in the second lip parts 30 and 31, and first recesses 34 and 35 formed in the web parts 22 and 23, the first flange part side of the channel material 21 is fit into the recess of the channel material 20 and the first flange part side of the channel material 20 is fit into the recess of the channel material 21, and the first projection 32 of the channel material 20 is fit into the first recess 34 thereof and the first projection 33 of the channel material 21 is fit into the first recess 35 thereof.SELECTED DRAWING: Figure 1
【課題】一組のチャンネル材を組み立てた組立材において、接合部品を用いなくても、一組のチャンネル材の組立状態を維持できる組立材を提供する。【解決手段】組立材20は、一組のチャンネル材20,21を組み立てた組立材であり、チャンネル材20,21は、ウェブ部22,23と、第1フランジ部24,25と、第1フランジ部24,25よりも延出長さが長い第2フランジ部26,27と、第1リップ部28,29と、第2リップ部30,31と、第2リップ部30,31に形成された第1凸部32,33と、ウェブ部22,23に形成された第1凹部34,35と、を有し、チャンネル材20の凹状部にチャンネル材21の第1フランジ部側が嵌合すると共にチャンネル材21の凹状部にチャンネル材20の第1フランジ部側が嵌合し、チャンネル材20の第1凸部32及び第1凹部34と、チャンネル材21の第1凹部35及び第1凸部33とがそれぞれ係合している。【選択図】図1
ASSEMBLY MATERIAL, CHANNEL MATERIAL, LOAD BEARING WALL, TRUSS BEAM, AND BEAM
組立材、チャンネル材、耐力壁、トラス梁、及び、梁
KOBASHI TOMOKI (author) / TONAI SHIGEAKI (author)
2020-06-04
Patent
Electronic Resource
Japanese
ASSEMBLY MATERIAL, SHAPED STEEL, TRUSS BEAM, BEARING WALL, AND BEAM
European Patent Office | 2021
|BEAM MATERIAL LOAD BEARING STRUCTURE AND BEAM MATERIAL REPAIR METHOD
European Patent Office | 2017
|