A platform for research: civil engineering, architecture and urbanism
FOUNDATION STRUCTURE AND FOUNDATION CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To simply install a new foundation in addition to an existing foundation without the need for anchorage of bar arrangement for the existing foundation and the new foundation.SOLUTION: A foundation structure includes an already-arranged existing foundation 2 of a foundation structure 1 for supporting a building, and a new foundation 3 that is newly arranged by being connected to the existing foundation 2. The existing foundation 2 comprises a protruding member 23 that protrudes in the state of being fixed to a joint J for connecting the existing foundation 2 and the new foundation 3 together. The new foundation 3 comprises arranged bars 33, 34, 35 and 36 that are connected to the protruding member 23.SELECTED DRAWING: Figure 1
【課題】既設基礎と新設基礎との配筋を定着させる必要がなく、既設基礎に新たな基礎を簡易に設ける。【解決手段】建物を支持する基礎構造1のうち既に配置された既設基礎2と、前記既設基礎2に接続して新たに配置される新設基礎3と、を備え、前記既設基礎2は、前記既設基礎2と前記新設基礎3とが接続する接続部Jに対して固定され突出する突出部材23を備え、前記新設基礎3は、前記突出部材23に接続される配筋33,34,35,36を備える。【選択図】図1
FOUNDATION STRUCTURE AND FOUNDATION CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To simply install a new foundation in addition to an existing foundation without the need for anchorage of bar arrangement for the existing foundation and the new foundation.SOLUTION: A foundation structure includes an already-arranged existing foundation 2 of a foundation structure 1 for supporting a building, and a new foundation 3 that is newly arranged by being connected to the existing foundation 2. The existing foundation 2 comprises a protruding member 23 that protrudes in the state of being fixed to a joint J for connecting the existing foundation 2 and the new foundation 3 together. The new foundation 3 comprises arranged bars 33, 34, 35 and 36 that are connected to the protruding member 23.SELECTED DRAWING: Figure 1
【課題】既設基礎と新設基礎との配筋を定着させる必要がなく、既設基礎に新たな基礎を簡易に設ける。【解決手段】建物を支持する基礎構造1のうち既に配置された既設基礎2と、前記既設基礎2に接続して新たに配置される新設基礎3と、を備え、前記既設基礎2は、前記既設基礎2と前記新設基礎3とが接続する接続部Jに対して固定され突出する突出部材23を備え、前記新設基礎3は、前記突出部材23に接続される配筋33,34,35,36を備える。【選択図】図1
FOUNDATION STRUCTURE AND FOUNDATION CONSTRUCTION METHOD
基礎構造および基礎の施工方法
SATO MASAYA (author) / TAKAGI MAKOTO (author) / KAJIKAWA HISAMITSU (author)
2017-01-26
Patent
Electronic Resource
Japanese
FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
European Patent Office | 2022
|FOUNDATION STRUCTURE, AND FOUNDATION CONSTRUCTION METHOD
European Patent Office | 2020
|