A platform for research: civil engineering, architecture and urbanism
FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
To provide a foundation structure and a foundation structure construction method allowing construction cost and construction time to be reduced even when constructing pits in a foundation of a structure as well as securing the same workability as a case without construction of pits.SOLUTION: A foundation structure construction method for a foundation 1 including a work floor 3 installed on the ground 2 and footing 4 installed at a position of a column 9 of a construction with spaced in two directions on the plane of the work floor 3 to support a first story floor 8 of the construction comprises the steps of: installing a mat foundation 5 in a direction intersecting with the direction of at least footings 4, 4 being adjacent to each other, between the adjacent footings 4, 4 in either of directions on the working floor 3; installing a beam 6 between the adjacent footings 4, 4 in a direction parallel to either of directions where the mat foundation 5 continues; and installing the first story floor 8 on a top end of the footing 4, to support the first story floor 8 with the footing 4.SELECTED DRAWING: Figure 1
【課題】構造物の基礎にピットを形成しながらも、ピットを形成しない場合と同等の施工性を確保し、工費の節減と工期の短縮を可能にする。【解決手段】地盤2上に設置された作業床3と、作業床3上に平面上、二方向に間隔を置き、構造物の柱9の位置に設置されるフーチング4を含み、構造物の1階床8を支持する基礎1において、作業床3上の、いずれかの一方向に隣接するフーチング4、4間に、少なくともフーチング4、4の隣接する方向に交差する方向に布基礎5を設置し、布基礎5が連続するいずれかの一方向と平行な方向に隣接するフーチング4、4間に小梁6を架設し、フーチング4の天端上に1階床8を設置し、1階床8をフーチング4に支持させる。【選択図】図1
FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
To provide a foundation structure and a foundation structure construction method allowing construction cost and construction time to be reduced even when constructing pits in a foundation of a structure as well as securing the same workability as a case without construction of pits.SOLUTION: A foundation structure construction method for a foundation 1 including a work floor 3 installed on the ground 2 and footing 4 installed at a position of a column 9 of a construction with spaced in two directions on the plane of the work floor 3 to support a first story floor 8 of the construction comprises the steps of: installing a mat foundation 5 in a direction intersecting with the direction of at least footings 4, 4 being adjacent to each other, between the adjacent footings 4, 4 in either of directions on the working floor 3; installing a beam 6 between the adjacent footings 4, 4 in a direction parallel to either of directions where the mat foundation 5 continues; and installing the first story floor 8 on a top end of the footing 4, to support the first story floor 8 with the footing 4.SELECTED DRAWING: Figure 1
【課題】構造物の基礎にピットを形成しながらも、ピットを形成しない場合と同等の施工性を確保し、工費の節減と工期の短縮を可能にする。【解決手段】地盤2上に設置された作業床3と、作業床3上に平面上、二方向に間隔を置き、構造物の柱9の位置に設置されるフーチング4を含み、構造物の1階床8を支持する基礎1において、作業床3上の、いずれかの一方向に隣接するフーチング4、4間に、少なくともフーチング4、4の隣接する方向に交差する方向に布基礎5を設置し、布基礎5が連続するいずれかの一方向と平行な方向に隣接するフーチング4、4間に小梁6を架設し、フーチング4の天端上に1階床8を設置し、1階床8をフーチング4に支持させる。【選択図】図1
FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
基礎構造及び基礎構造の施工方法
TAKADA RINTARO (author) / HARA KENJI (author)
2022-08-22
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF FOUNDATION STRUCTURE
European Patent Office | 2017
|FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
European Patent Office | 2020
|