CONCRETE PLACING/OVERLAYING TIME MANAGEMENT DEVICE AND CONCRETE PLACING/OVERLAYING TIME MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a concrete placing/overlaying time management device and a concrete placing/overlaying time management method in which a working progress of placing/overlaying of concrete can be grasped easily.SOLUTION: A concrete placing/overlaying time management device includes: a placing/overlaying time estimation unit for estimating a placing/overlaying time of a target block being a calculation target from the placement speed of the target block in a construction area of concrete overlaying multiple layers where one layer is divided into multiple blocks in a plane direction; and a layer thickness specification unit for comparing an estimated placing/overlaying time with a preset placing/overlaying time, and outputting information for designating a layer thickness according to results of comparison.SELECTED DRAWING: Figure 2
【課題】打ち重ねの作業の進捗を容易に把握することができるコンクリート打重ね時間管理装置およびコンクリートの打重ね時間管理方法を提供することにある。【解決手段】1つの層が平面方向において複数のブロックに分割されており、当該層が複数重ねられたコンクリートの施工領域における算出対象である対象ブロックの打重ね時間を前記対象ブロックの打設速度から予測する打重ね時間予測部と、予測された打重ね時間と予め設定された打重ね時間とを比較し、比較結果に応じて、層厚を指定する情報を出力する層厚指定部と、を備える。【選択図】図2
CONCRETE PLACING/OVERLAYING TIME MANAGEMENT DEVICE AND CONCRETE PLACING/OVERLAYING TIME MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a concrete placing/overlaying time management device and a concrete placing/overlaying time management method in which a working progress of placing/overlaying of concrete can be grasped easily.SOLUTION: A concrete placing/overlaying time management device includes: a placing/overlaying time estimation unit for estimating a placing/overlaying time of a target block being a calculation target from the placement speed of the target block in a construction area of concrete overlaying multiple layers where one layer is divided into multiple blocks in a plane direction; and a layer thickness specification unit for comparing an estimated placing/overlaying time with a preset placing/overlaying time, and outputting information for designating a layer thickness according to results of comparison.SELECTED DRAWING: Figure 2
【課題】打ち重ねの作業の進捗を容易に把握することができるコンクリート打重ね時間管理装置およびコンクリートの打重ね時間管理方法を提供することにある。【解決手段】1つの層が平面方向において複数のブロックに分割されており、当該層が複数重ねられたコンクリートの施工領域における算出対象である対象ブロックの打重ね時間を前記対象ブロックの打設速度から予測する打重ね時間予測部と、予測された打重ね時間と予め設定された打重ね時間とを比較し、比較結果に応じて、層厚を指定する情報を出力する層厚指定部と、を備える。【選択図】図2
CONCRETE PLACING/OVERLAYING TIME MANAGEMENT DEVICE AND CONCRETE PLACING/OVERLAYING TIME MANAGEMENT METHOD
コンクリート打重ね時間管理装置およびコンクリートの打重ね時間管理方法
UNO MASATOSHI (author) / NEMOTO HIROSHI (author) / OGUSHI MASAAKI (author) / MIYASE FUMIHIRO (author)
2017-02-16
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2023
|