A platform for research: civil engineering, architecture and urbanism
FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To reduce an excavation amount and a soil removal amount of the soil.SOLUTION: A foundation structure 10 comprises a steel foundation beam 50 which is embedded into the ground, and a foundation bottom board 30 which is supported to the steel foundation beam 50, and arranged on the ground G. Here, the foundation bottom board 30 is directly supported to the ground G, and also supported to the ground G via the steel foundation beam 50. A stud 60 is arranged at an upper-side flange 52U of the steel foundation beam 50. The stud 60 arranged at the upper-side flange 52U is embedded into the foundation bottom board 30, and the foundation bottom board 30 and the steel foundation beam 50 are joined and integrated to each other, thus constituting a composite beam.SELECTED DRAWING: Figure 1
【課題】地盤の掘削量及び排土量を削減する。【解決手段】基礎構造10は、地盤Gに埋設された鉄骨基礎梁50と、鉄骨基礎梁50に支持されると共に地盤G上に設けられた基礎底盤30と、を備えている。なお、基礎底盤30は、地盤Gに直接支持されていると共に、鉄骨基礎梁50を介して地盤Gに支持されている。鉄骨基礎梁50の上側フランジ52Uには、スタッド60が設けられている。そして、上側フランジ52Uに設けられたスタッド60が基礎底盤30に埋設されることで、基礎底盤30と鉄骨基礎梁50とが接合されると共に、両者が一体化され合成梁を構成する。【選択図】図1
FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To reduce an excavation amount and a soil removal amount of the soil.SOLUTION: A foundation structure 10 comprises a steel foundation beam 50 which is embedded into the ground, and a foundation bottom board 30 which is supported to the steel foundation beam 50, and arranged on the ground G. Here, the foundation bottom board 30 is directly supported to the ground G, and also supported to the ground G via the steel foundation beam 50. A stud 60 is arranged at an upper-side flange 52U of the steel foundation beam 50. The stud 60 arranged at the upper-side flange 52U is embedded into the foundation bottom board 30, and the foundation bottom board 30 and the steel foundation beam 50 are joined and integrated to each other, thus constituting a composite beam.SELECTED DRAWING: Figure 1
【課題】地盤の掘削量及び排土量を削減する。【解決手段】基礎構造10は、地盤Gに埋設された鉄骨基礎梁50と、鉄骨基礎梁50に支持されると共に地盤G上に設けられた基礎底盤30と、を備えている。なお、基礎底盤30は、地盤Gに直接支持されていると共に、鉄骨基礎梁50を介して地盤Gに支持されている。鉄骨基礎梁50の上側フランジ52Uには、スタッド60が設けられている。そして、上側フランジ52Uに設けられたスタッド60が基礎底盤30に埋設されることで、基礎底盤30と鉄骨基礎梁50とが接合されると共に、両者が一体化され合成梁を構成する。【選択図】図1
FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF FOUNDATION STRUCTURE
基礎構造及び基礎構造の施工方法
MAEKAWA MOTONOBU (author) / SABURI KAZUHIRO (author) / KUMANO TOSHIHITO (author) / KAWAKAMI TAKUMA (author) / HAMADA YUKIHIRO (author)
2017-02-23
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
European Patent Office | 2022
|FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
European Patent Office | 2020
|