HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
PROBLEM TO BE SOLVED: To provide a holding device of a vibration hammer capable of holding a steel pipe by exerting pressing force only from one direction inside or outside of the steel pipe and without deforming the steel pipe, along with an installation method of a steel pipe pile using the same.SOLUTION: A holding device 1 of a vibration hammer VH is for holding a steel pipe P, and includes a head part 2, a support part 3 extending downward from an undersurface of the head part 2, and one or a plurality of pressing means 4 provided at one or a plurality of locations in the direction of extension of the support part 3 and generating pressing force in an outward or inward direction on an inner or outer surface of the steel pipe P. The pressing force is of a magnitude sufficient for generating frictional force that can fix the steel pipe P at a time of driving or pull-out by the vibration hammer VH. Furthermore, a location of pressing by the pressing means 4 on the steel pipe P is in an intermediate region in a lengthwise direction of the steel pipe P, so as not to cause deformation by the pressing force.SELECTED DRAWING: Figure 1
【課題】鋼管の管内又は管外の一方のみから押圧力を及ぼして鋼管を把持することができかつ鋼管の変形を生じないバイブロハンマの把持装置及びこれを用いた鋼管杭の施工方法を提供する。【解決手段】鋼管Pを把持するためのバイブロハンマVHの把持装置1であって、ヘッド部2と、ヘッド部2の下面から下方に延在する支持部3と、支持部3の延在方向の1箇所又は複数箇所に設けられ鋼管Pの内面又は外面に対し外向き又は内向きに押圧力を発生可能な1又は複数の押圧手段4と、を有し、押圧力はバイブロハンマVHによる打込み又は引抜きの際に鋼管Pを固定可能な摩擦力を生じる大きさであり、かつ、押圧手段4が鋼管Pを押圧する位置は、押圧力による変形を生じない、該鋼管Pの長さ方向の中間領域にある。【選択図】図1
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
PROBLEM TO BE SOLVED: To provide a holding device of a vibration hammer capable of holding a steel pipe by exerting pressing force only from one direction inside or outside of the steel pipe and without deforming the steel pipe, along with an installation method of a steel pipe pile using the same.SOLUTION: A holding device 1 of a vibration hammer VH is for holding a steel pipe P, and includes a head part 2, a support part 3 extending downward from an undersurface of the head part 2, and one or a plurality of pressing means 4 provided at one or a plurality of locations in the direction of extension of the support part 3 and generating pressing force in an outward or inward direction on an inner or outer surface of the steel pipe P. The pressing force is of a magnitude sufficient for generating frictional force that can fix the steel pipe P at a time of driving or pull-out by the vibration hammer VH. Furthermore, a location of pressing by the pressing means 4 on the steel pipe P is in an intermediate region in a lengthwise direction of the steel pipe P, so as not to cause deformation by the pressing force.SELECTED DRAWING: Figure 1
【課題】鋼管の管内又は管外の一方のみから押圧力を及ぼして鋼管を把持することができかつ鋼管の変形を生じないバイブロハンマの把持装置及びこれを用いた鋼管杭の施工方法を提供する。【解決手段】鋼管Pを把持するためのバイブロハンマVHの把持装置1であって、ヘッド部2と、ヘッド部2の下面から下方に延在する支持部3と、支持部3の延在方向の1箇所又は複数箇所に設けられ鋼管Pの内面又は外面に対し外向き又は内向きに押圧力を発生可能な1又は複数の押圧手段4と、を有し、押圧力はバイブロハンマVHによる打込み又は引抜きの際に鋼管Pを固定可能な摩擦力を生じる大きさであり、かつ、押圧手段4が鋼管Pを押圧する位置は、押圧力による変形を生じない、該鋼管Pの長さ方向の中間領域にある。【選択図】図1
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
バイブロハンマの把持装置及び鋼管杭の施工方法
NAKASHIRO NOBUHIRO (author) / YOKOYAMA HIROYASU (author) / KATO TSUTOMU (author) / SUZUKI YUKICHI (author)
2017-05-25
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
European Patent Office | 2017
|GRIPPING DEVICE OF VIBRATION HAMMER, AND STEEL SHEET PILE INSTALLATION METHOD
European Patent Office | 2017
|STEEL PIPE PILE, INSTALLATION METHOD FOR STEEL PIPE PILE
European Patent Office | 2016
|European Patent Office | 2018
|European Patent Office | 2022
|