METHOD FOR MANUFACTURING NATURAL STONE BLOCK
PROBLEM TO BE SOLVED: To provide a method for easily manufacturing a natural stone block in a small number of steps and with only simple materials.SOLUTION: A beam material 3 is set on a formwork 2 and a natural stone 4 is suspended at the upper part of a space inside the formwork 2 from the beam material 3 through a suspending material 5 tied around the natural stone 4, and concrete 8 is installed inside the formwork 2 so that a lower side of the natural stone 4 suspended is partially buried in the concrete 8. By vibration work, air bubble in the concrete 8 is removed, and when the concrete 8 is semi-cured, the beam material 3 is removed, and the suspending material 5 in a state of being partially buried in the concrete 8 is removed from the inside of the concrete 8 and after the concrete 8 is cured, the formwork is removed.SELECTED DRAWING: Figure 1
【課題】少ない工程で、かつ、簡単な機材のみで、自然石ブロックを容易に製造することができる方法を提供する。【解決手段】型枠2の上に梁材3をセットし、自然石4の周りに括り付けた吊下材5を介して、梁材3から自然石4を型枠2内空間の上方に吊り下げ、吊り下げられている自然石4の下側が部分的にコンクリート8中に埋没した状態となるように、型枠2内にコンクリート8を打設し、バイブレーション作業によってコンクリート8中の気泡を除去し、コンクリート8が半硬化状態となったら、梁材3を撤去し、部分的にコンクリート8中に埋没した状態の吊下材5をコンクリート8中から取り除き、コンクリート8の硬化後に脱型する。【選択図】図1
METHOD FOR MANUFACTURING NATURAL STONE BLOCK
PROBLEM TO BE SOLVED: To provide a method for easily manufacturing a natural stone block in a small number of steps and with only simple materials.SOLUTION: A beam material 3 is set on a formwork 2 and a natural stone 4 is suspended at the upper part of a space inside the formwork 2 from the beam material 3 through a suspending material 5 tied around the natural stone 4, and concrete 8 is installed inside the formwork 2 so that a lower side of the natural stone 4 suspended is partially buried in the concrete 8. By vibration work, air bubble in the concrete 8 is removed, and when the concrete 8 is semi-cured, the beam material 3 is removed, and the suspending material 5 in a state of being partially buried in the concrete 8 is removed from the inside of the concrete 8 and after the concrete 8 is cured, the formwork is removed.SELECTED DRAWING: Figure 1
【課題】少ない工程で、かつ、簡単な機材のみで、自然石ブロックを容易に製造することができる方法を提供する。【解決手段】型枠2の上に梁材3をセットし、自然石4の周りに括り付けた吊下材5を介して、梁材3から自然石4を型枠2内空間の上方に吊り下げ、吊り下げられている自然石4の下側が部分的にコンクリート8中に埋没した状態となるように、型枠2内にコンクリート8を打設し、バイブレーション作業によってコンクリート8中の気泡を除去し、コンクリート8が半硬化状態となったら、梁材3を撤去し、部分的にコンクリート8中に埋没した状態の吊下材5をコンクリート8中から取り除き、コンクリート8の硬化後に脱型する。【選択図】図1
METHOD FOR MANUFACTURING NATURAL STONE BLOCK
自然石ブロックの製造方法
HATTORI MASAYUKI (author) / KASAHARA KOSUKE (author) / SANADA TAKEHIRO (author)
2017-06-01
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
MANUFACTURING METHOD FOR BLOCK HAVING NATURAL GRANITE STONE IMAGE
European Patent Office | 2020
|MANUFACTURING METHOD OF STONE-FINISHED BLOCK, AND STONE MATERIAL FOR STONE-FINISHED BLOCK