A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a building verge structure capable of properly and reliably draining in a verge part.SOLUTION: The building verge structure includes: a sheathing roof board 11; a climbing tree 14 fixed to a gable end upper plane of the sheathing roof board 11; a roof exterior material 13 placed on the upper plane of the sheathing roof board 11; a vergeboard 15 which is disposed in a lower face of the gable end of the sheathing roof board 11; a verge member 2 which covers the gable end of the roof exterior material 13, the climbing tree 14, the gable end of the sheathing roof board 11, and the vergeboard 15; and a verge draining 4 disposed inside the verge member 2. The verge draining 4 includes: a cover part 40 covering the climbing tree; a drainage side 41 which is disposed beneath the gable end of the roof exterior material 13; and an extension cover part 43 covering the exterior of the vergeboard.SELECTED DRAWING: Figure 1
【課題】けらば部分の水切を適切に且つ確実に行う。【解決手段】野地板11と、野地板11の妻側端部上面に固定されるのぼり木14と、野地板11の上面に載置される屋根外装材13と、野地板11の妻側端部の下面側に設けられる破風板15と、屋根外装材13の妻側端部とのぼり木14と野地板11の妻側端部と破風板15とを覆うけらば部材2と、けらば部材2の内側に配されたけらば水切4とを備える。けらば水切4は、のぼり木を覆うカバー部40と、屋根外装材13の妻側端部の下側に配置される水切辺41と、破風板の外面を覆う延長カバー部43とを有する。【選択図】図1
PROBLEM TO BE SOLVED: To provide a building verge structure capable of properly and reliably draining in a verge part.SOLUTION: The building verge structure includes: a sheathing roof board 11; a climbing tree 14 fixed to a gable end upper plane of the sheathing roof board 11; a roof exterior material 13 placed on the upper plane of the sheathing roof board 11; a vergeboard 15 which is disposed in a lower face of the gable end of the sheathing roof board 11; a verge member 2 which covers the gable end of the roof exterior material 13, the climbing tree 14, the gable end of the sheathing roof board 11, and the vergeboard 15; and a verge draining 4 disposed inside the verge member 2. The verge draining 4 includes: a cover part 40 covering the climbing tree; a drainage side 41 which is disposed beneath the gable end of the roof exterior material 13; and an extension cover part 43 covering the exterior of the vergeboard.SELECTED DRAWING: Figure 1
【課題】けらば部分の水切を適切に且つ確実に行う。【解決手段】野地板11と、野地板11の妻側端部上面に固定されるのぼり木14と、野地板11の上面に載置される屋根外装材13と、野地板11の妻側端部の下面側に設けられる破風板15と、屋根外装材13の妻側端部とのぼり木14と野地板11の妻側端部と破風板15とを覆うけらば部材2と、けらば部材2の内側に配されたけらば水切4とを備える。けらば水切4は、のぼり木を覆うカバー部40と、屋根外装材13の妻側端部の下側に配置される水切辺41と、破風板の外面を覆う延長カバー部43とを有する。【選択図】図1
BUILDING VERGE STRUCTURE
建物のけらば構造
SAEKI ERIKO (author)
2017-08-03
Patent
Electronic Resource
Japanese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
VERGE STRUCTURE OF BUILDING AND VERGE PROCESSING METHOD OF BUILDING
European Patent Office | 2017
|VERGE COVER, VERGE STRUCTURE, AND MANUFACTURING METHOD OF VERGE COVER
European Patent Office | 2017
|VERGE COVER, VERGE STRUCTURE, AND MANUFACTURING METHOD OF VERGE COVER
European Patent Office | 2017
|