A platform for research: civil engineering, architecture and urbanism
ANCHOR, AND INSTALLATION TOOL AND INSTALLATION METHOD FOR THE SAME
PROBLEM TO BE SOLVED: To enhance work efficiency by enabling processes for fixing an anchor on a lower hole of a ceiling slab and fitting a hanging bolt to hang down to be performed serially.SOLUTION: An anchor installation method includes: a first step for fitting a break nut 60 to a hanging bolt 9; a second step for fitting a tip of the hanging bolt 9 to a long nut 50 of an anchor 1; a third step for inserting the other end of the hanging bolt 9 into an anchor installation tool 2 and engaging a second nut part 62 of the break nut 60 to an engaging part 71 of the anchor installation tool 2; a step 4 for inserting a fixing part 3 of the anchor 1 into a lower hole 7 of a ceiling slab; a fifth step for rotating the anchor installation 2 thereby connecting a first nut part 61 of the break nut 60 to the long nut 50 and fixing a fixing part 3 of the anchor 1 to the lower hole 7; a sixth step for continuing the rotation of the anchor installation tool 2 and breaking a breaking part 63; and a seventh step for pulling out the anchor installation tool 2 from the hanging bolt 9.SELECTED DRAWING: Figure 4
【課題】天井スラブの下孔にアンカーを固定して吊りボルトを垂下状態に取り付ける作業を一連の作業として行えるようにして作業効率を向上させる。【解決手段】破断ナット60を吊りボルト9に取り付ける第1工程と、アンカー1のロングナット50に対し、吊りボルト9の先端を装着する第2工程と、吊りボルト9の他端をアンカー施工具2の内側に挿入し、破断ナット60の第2ナット部62をアンカー施工具2の係合部71に係合させる第3工程と、天井スラブの下孔7にアンカー1の固定部3を挿入する第4工程と、アンカー施工具2を回転させることにより、破断ナット60の第1ナット部61をロングナット50に接合させると共に、アンカー1の固定部3を下孔7に固定する第5工程と、アンカー施工具2の回転を継続させて破断部63を破断させる第6工程と、アンカー施工具2を吊りボルト9から引き抜く第7工程と、を有する。【選択図】図4
ANCHOR, AND INSTALLATION TOOL AND INSTALLATION METHOD FOR THE SAME
PROBLEM TO BE SOLVED: To enhance work efficiency by enabling processes for fixing an anchor on a lower hole of a ceiling slab and fitting a hanging bolt to hang down to be performed serially.SOLUTION: An anchor installation method includes: a first step for fitting a break nut 60 to a hanging bolt 9; a second step for fitting a tip of the hanging bolt 9 to a long nut 50 of an anchor 1; a third step for inserting the other end of the hanging bolt 9 into an anchor installation tool 2 and engaging a second nut part 62 of the break nut 60 to an engaging part 71 of the anchor installation tool 2; a step 4 for inserting a fixing part 3 of the anchor 1 into a lower hole 7 of a ceiling slab; a fifth step for rotating the anchor installation 2 thereby connecting a first nut part 61 of the break nut 60 to the long nut 50 and fixing a fixing part 3 of the anchor 1 to the lower hole 7; a sixth step for continuing the rotation of the anchor installation tool 2 and breaking a breaking part 63; and a seventh step for pulling out the anchor installation tool 2 from the hanging bolt 9.SELECTED DRAWING: Figure 4
【課題】天井スラブの下孔にアンカーを固定して吊りボルトを垂下状態に取り付ける作業を一連の作業として行えるようにして作業効率を向上させる。【解決手段】破断ナット60を吊りボルト9に取り付ける第1工程と、アンカー1のロングナット50に対し、吊りボルト9の先端を装着する第2工程と、吊りボルト9の他端をアンカー施工具2の内側に挿入し、破断ナット60の第2ナット部62をアンカー施工具2の係合部71に係合させる第3工程と、天井スラブの下孔7にアンカー1の固定部3を挿入する第4工程と、アンカー施工具2を回転させることにより、破断ナット60の第1ナット部61をロングナット50に接合させると共に、アンカー1の固定部3を下孔7に固定する第5工程と、アンカー施工具2の回転を継続させて破断部63を破断させる第6工程と、アンカー施工具2を吊りボルト9から引き抜く第7工程と、を有する。【選択図】図4
ANCHOR, AND INSTALLATION TOOL AND INSTALLATION METHOD FOR THE SAME
アンカー、アンカー施工具及びその施工方法
IKUNO MAKOTO (author)
2017-11-09
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
ANCHOR INSTALLATION TOOL, AND ANCHOR INSTALLATION METHOD USING THE SAME
European Patent Office | 2016
|VERTICAL INSTALLATION TOOL FOR ANCHOR BOLT AND VERTICAL INSTALLATION METHOD FOR ANCHOR BOLT
European Patent Office | 2021
|