ROOF CONSTRUCTION METHOD AND ROOF
PROBLEM TO BE SOLVED: To enable efficient construction of a roof body on a small surface area.SOLUTION: A roof construction method is for constructing a roof body 4 on a building B, the roof body being supported swingably in a vertical direction on a roof support post 1A, with an edge part on the roof support post 1A side functioning as a fulcrum, while being cantilevered from the roof support post 1A that serves as a roof structural body. The roof construction method includes a support post erection step for erecting the roof support post 1A, a roof construction step for constructing the roof body 4 on the roof support post 1A in a tilted attitude tilted closer to the roof support post 1A than an attitude at construction work completion when the roof body was constructed on the building B, and an attitude changing step for changing the attitude of the roof body 4 from the tilted attitude to the attitude at construction work completion and fixing to the attitude at construction work completion.SELECTED DRAWING: Figure 1
【課題】少ない平面積で、効率的に屋根本体の施工を実施できるようにする。【解決手段】屋根構造体としての屋根支柱1Aから片持ち状に持ち出された状態で屋根支柱1A側の端部を支点として上下揺動可能に屋根支柱1Aに支持された屋根本体4を、建築物Bに構築する屋根構築方法であって、屋根支柱1Aを立設する柱立設工程と、屋根本体4を、建築物Bに構築した際の構築完了姿勢よりも屋根支柱1Aに近づく倒立姿勢で屋根支柱1Aに施工する屋根施工工程と、屋根本体4を倒立姿勢から構築完了姿勢に姿勢変更し、構築完了姿勢に固定する姿勢変更工程と、を備えている。【選択図】図1
ROOF CONSTRUCTION METHOD AND ROOF
PROBLEM TO BE SOLVED: To enable efficient construction of a roof body on a small surface area.SOLUTION: A roof construction method is for constructing a roof body 4 on a building B, the roof body being supported swingably in a vertical direction on a roof support post 1A, with an edge part on the roof support post 1A side functioning as a fulcrum, while being cantilevered from the roof support post 1A that serves as a roof structural body. The roof construction method includes a support post erection step for erecting the roof support post 1A, a roof construction step for constructing the roof body 4 on the roof support post 1A in a tilted attitude tilted closer to the roof support post 1A than an attitude at construction work completion when the roof body was constructed on the building B, and an attitude changing step for changing the attitude of the roof body 4 from the tilted attitude to the attitude at construction work completion and fixing to the attitude at construction work completion.SELECTED DRAWING: Figure 1
【課題】少ない平面積で、効率的に屋根本体の施工を実施できるようにする。【解決手段】屋根構造体としての屋根支柱1Aから片持ち状に持ち出された状態で屋根支柱1A側の端部を支点として上下揺動可能に屋根支柱1Aに支持された屋根本体4を、建築物Bに構築する屋根構築方法であって、屋根支柱1Aを立設する柱立設工程と、屋根本体4を、建築物Bに構築した際の構築完了姿勢よりも屋根支柱1Aに近づく倒立姿勢で屋根支柱1Aに施工する屋根施工工程と、屋根本体4を倒立姿勢から構築完了姿勢に姿勢変更し、構築完了姿勢に固定する姿勢変更工程と、を備えている。【選択図】図1
ROOF CONSTRUCTION METHOD AND ROOF
屋根構築方法、及び、屋根
IWAMOTO TAKUMA (author) / SAKURAGAWA NORIO (author)
2017-12-07
Patent
Electronic Resource
Japanese
ROOF DRAIN, ROOF DRAIN CONSTRUCTION JIG, AND ROOF DRAIN CONSTRUCTION METHOD
European Patent Office | 2022
|ROOF BRACING MATERIAL, ROOF STRUCTURE AND ROOF CONSTRUCTION METHOD
European Patent Office | 2020
|