ROOF CONSTRUCTION SYSTEM AND ROOF CONSTRUCTION METHOD
To provide a roof construction system and a roof construction method, capable of efficiently disposing folded plates on a roof.SOLUTION: A roof construction system 100 pushes out folded plates molded from a steel plate roll R1 by a molding machine M1 to construct a roof of a building 20. The roof construction system 100 comprises a plurality of working platforms that are movable in a work area in which a folded plate to be disposed on the roof can be pushed out. The plurality of working platforms comprise: a machine working platform 50 on which the molding machine M1 is to be placed; a material transportation working platform 30 on which the steel plate roll R1 is to be placed; and a crane working platform 40 on which a crane CL1 is placed. The crane CL1 transfers the steel plate roll R1 from the material transportation working platform 30 to the machine working platform 50.SELECTED DRAWING: Figure 2
【課題】折板を屋根に効率的に配置することができる屋根施工システム及び屋根施工方法を提供する。【解決手段】屋根施工システム100は、成形機M1によって鋼板ロールR1から成形される折板を押し出して建物20の屋根を施工する。屋根施工システム100は、屋根に配置する折板を押し出せる作業エリアにおいて移動可能な複数の構台を備える。これら複数の構台は、成形機M1を載置する機械構台50と、鋼板ロールR1を載置する資材搬送構台30と、クレーンCL1を載置したクレーン構台40とを備える。クレーンCL1は、鋼板ロールR1を、資材搬送構台30から機械構台50に移し替える。【選択図】図2
ROOF CONSTRUCTION SYSTEM AND ROOF CONSTRUCTION METHOD
To provide a roof construction system and a roof construction method, capable of efficiently disposing folded plates on a roof.SOLUTION: A roof construction system 100 pushes out folded plates molded from a steel plate roll R1 by a molding machine M1 to construct a roof of a building 20. The roof construction system 100 comprises a plurality of working platforms that are movable in a work area in which a folded plate to be disposed on the roof can be pushed out. The plurality of working platforms comprise: a machine working platform 50 on which the molding machine M1 is to be placed; a material transportation working platform 30 on which the steel plate roll R1 is to be placed; and a crane working platform 40 on which a crane CL1 is placed. The crane CL1 transfers the steel plate roll R1 from the material transportation working platform 30 to the machine working platform 50.SELECTED DRAWING: Figure 2
【課題】折板を屋根に効率的に配置することができる屋根施工システム及び屋根施工方法を提供する。【解決手段】屋根施工システム100は、成形機M1によって鋼板ロールR1から成形される折板を押し出して建物20の屋根を施工する。屋根施工システム100は、屋根に配置する折板を押し出せる作業エリアにおいて移動可能な複数の構台を備える。これら複数の構台は、成形機M1を載置する機械構台50と、鋼板ロールR1を載置する資材搬送構台30と、クレーンCL1を載置したクレーン構台40とを備える。クレーンCL1は、鋼板ロールR1を、資材搬送構台30から機械構台50に移し替える。【選択図】図2
ROOF CONSTRUCTION SYSTEM AND ROOF CONSTRUCTION METHOD
屋根施工システム及び屋根施工方法
MITSUNAGA YU (author) / UESHIMA YASUHIRO (author)
2021-09-13
Patent
Electronic Resource
Japanese
ROOF DRAIN, ROOF DRAIN CONSTRUCTION JIG, AND ROOF DRAIN CONSTRUCTION METHOD
European Patent Office | 2022
|ROOF DRAIN, ROOF DRAIN CONSTRUCTION JIG, ROOF DRAIN CONSTRUCTION METHOD, AND DRAINAGE SYSTEM
European Patent Office | 2024
|