CONSTRUCTION MANAGEMENT SYSTEM OF PILE AND CONSTRUCTION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a construction management system of a pile which can surely acquire report data which are submitted to a construction manager of the pile, and can also store backup data of the report data, and a construction management method.SOLUTION: A construction management system of a pile has: a measurement device which can measure construction management data related to the construction of the pile using an apparatus; a construction management device which can output report data on the basis of the construction management data; a recording device which can record the construction management data as at least one set of data together with a construction site name and a construction date and time, and can transmit at least one set of the data which have been recorded; and a file management device which can store at least one set of the data transmitted from the recording device. The measurement device automatically starts the measurement of the construction management data in response to an input of the power supply of the apparatus, and the recording device constantly and automatically transmits at least one set of the data toward the file management device.SELECTED DRAWING: Figure 1
【課題】杭の施工管理者に提出される報告書用データを確実に取得可能であるとともに、報告書用データのバックアップデータも保存可能な杭の施工管理システム、及び、施工管理方法を提供する。【解決手段】杭の施工管理システムは、機器を使用した杭の施工に関する施工管理データを計測可能な計測装置と、施工管理データに基づいて報告書用データを出力可能な施工管理装置と、施工管理データを、施工現場名及び施工日時とともに少なくとも1組のデータとして記録可能であり、且つ、記録した少なくとも1組のデータを送信可能な記録装置と、記録装置から送信された少なくとも1組のデータを保存可能なファイル管理装置と、を有する。計測装置は、機器の電源投入に対応して施工管理データの計測を自動的に開始するように構成され、記録装置は、少なくとも1組のデータをファイル管理装置に向けて定時に自動的に送信するように構成されている。【選択図】 図1
CONSTRUCTION MANAGEMENT SYSTEM OF PILE AND CONSTRUCTION MANAGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a construction management system of a pile which can surely acquire report data which are submitted to a construction manager of the pile, and can also store backup data of the report data, and a construction management method.SOLUTION: A construction management system of a pile has: a measurement device which can measure construction management data related to the construction of the pile using an apparatus; a construction management device which can output report data on the basis of the construction management data; a recording device which can record the construction management data as at least one set of data together with a construction site name and a construction date and time, and can transmit at least one set of the data which have been recorded; and a file management device which can store at least one set of the data transmitted from the recording device. The measurement device automatically starts the measurement of the construction management data in response to an input of the power supply of the apparatus, and the recording device constantly and automatically transmits at least one set of the data toward the file management device.SELECTED DRAWING: Figure 1
【課題】杭の施工管理者に提出される報告書用データを確実に取得可能であるとともに、報告書用データのバックアップデータも保存可能な杭の施工管理システム、及び、施工管理方法を提供する。【解決手段】杭の施工管理システムは、機器を使用した杭の施工に関する施工管理データを計測可能な計測装置と、施工管理データに基づいて報告書用データを出力可能な施工管理装置と、施工管理データを、施工現場名及び施工日時とともに少なくとも1組のデータとして記録可能であり、且つ、記録した少なくとも1組のデータを送信可能な記録装置と、記録装置から送信された少なくとも1組のデータを保存可能なファイル管理装置と、を有する。計測装置は、機器の電源投入に対応して施工管理データの計測を自動的に開始するように構成され、記録装置は、少なくとも1組のデータをファイル管理装置に向けて定時に自動的に送信するように構成されている。【選択図】 図1
CONSTRUCTION MANAGEMENT SYSTEM OF PILE AND CONSTRUCTION MANAGEMENT METHOD
杭の施工管理システム、及び、施工管理方法
YANO MITSUTOSHI (author)
2018-02-08
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM