A platform for research: civil engineering, architecture and urbanism
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, PILE GROUP, ROTARY PILE CONSTRUCTION AND MANAGEMENT DEVICE, ROTARY PILE CONSTRUCTION AND MANAGEMENT SYSTEM
The purpose of the present invention is to provide a rotary pile construction method which can prevent damage to a rotary pile. The rotary pile construction method of the present invention includes: a measurement step for measuring pile information including a variation amount of the rotary pile and a rotary torque of the rotary pile, while the rotary pile is rotatably pressed into the ground when the rotary pile that is installed with a blade is penetrated into the ground; a comparison step for determining whether a pile body is normal or abnormal from the relation between the rotary torque and an eccentric amount on the basis of a preset threshold; and a control step for controlling a rotary press-in condition of the rotary pile on the basis of pile information, wherein in the control step, the rotary torque of the rotary pile is controlled to be reduced, or the rotation is controlled to be stopped or reversed on the basis of the result from the comparison step.
Le but de la présente invention est de fournir un procédé de construction de pieu rotatif capable d'empêcher l'endommagement d'un pieu rotatif. Le procédé de construction de pieu rotatif selon la présente invention comprend : une étape de mesure consistant à mesurer des informations du pieu y compris une valeur de variation du pieu rotatif et un couple de rotation du pieu rotatif, pendant que le pieu rotatif est enfoncé par rotation dans le sol, lorsque le pieu rotatif pourvu d'une lame est enfoncé dans le sol ; une étape de comparaison consistant à déterminer si un corps de pieu est normal ou anormal à partir de la relation entre le couple rotatif et une quantité excentrique sur la base d'un seuil prédéfini ; et une étape de commande consistant à commander une condition d'enfoncement par rotation du pieu rotatif sur la base d'informations du pieu, dans l'étape de commande, le couple de rotation du pieu rotatif étant commandé pour être réduit, ou la rotation étant commandée pour être arrêtée ou inversée sur la base du résultat de l'étape de comparaison.
本発明は、回転杭の破損を防止することができる回転杭の施工方法を提供することを目的とする。本発明の回転杭の施工方法では、羽根を設けた回転杭を、地盤に貫入する際、地盤に対して回転杭を回転圧入中に、前記回転杭の変動量と回転杭の回転トルクを含む杭情報を計測する計測工程と、予め設定した閾値に基づいて、回転トルクと偏心量の関係から杭体の正常又は異常を判断する比較工程と、杭情報に基づき、回転杭の回転圧入の条件を制御する制御工程とを備え、制御工程において、比較工程の結果に基づいて、回転杭の回転トルクを低減、又は回転を停止若しくは反転するように制御する。
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, PILE GROUP, ROTARY PILE CONSTRUCTION AND MANAGEMENT DEVICE, ROTARY PILE CONSTRUCTION AND MANAGEMENT SYSTEM
The purpose of the present invention is to provide a rotary pile construction method which can prevent damage to a rotary pile. The rotary pile construction method of the present invention includes: a measurement step for measuring pile information including a variation amount of the rotary pile and a rotary torque of the rotary pile, while the rotary pile is rotatably pressed into the ground when the rotary pile that is installed with a blade is penetrated into the ground; a comparison step for determining whether a pile body is normal or abnormal from the relation between the rotary torque and an eccentric amount on the basis of a preset threshold; and a control step for controlling a rotary press-in condition of the rotary pile on the basis of pile information, wherein in the control step, the rotary torque of the rotary pile is controlled to be reduced, or the rotation is controlled to be stopped or reversed on the basis of the result from the comparison step.
Le but de la présente invention est de fournir un procédé de construction de pieu rotatif capable d'empêcher l'endommagement d'un pieu rotatif. Le procédé de construction de pieu rotatif selon la présente invention comprend : une étape de mesure consistant à mesurer des informations du pieu y compris une valeur de variation du pieu rotatif et un couple de rotation du pieu rotatif, pendant que le pieu rotatif est enfoncé par rotation dans le sol, lorsque le pieu rotatif pourvu d'une lame est enfoncé dans le sol ; une étape de comparaison consistant à déterminer si un corps de pieu est normal ou anormal à partir de la relation entre le couple rotatif et une quantité excentrique sur la base d'un seuil prédéfini ; et une étape de commande consistant à commander une condition d'enfoncement par rotation du pieu rotatif sur la base d'informations du pieu, dans l'étape de commande, le couple de rotation du pieu rotatif étant commandé pour être réduit, ou la rotation étant commandée pour être arrêtée ou inversée sur la base du résultat de l'étape de comparaison.
本発明は、回転杭の破損を防止することができる回転杭の施工方法を提供することを目的とする。本発明の回転杭の施工方法では、羽根を設けた回転杭を、地盤に貫入する際、地盤に対して回転杭を回転圧入中に、前記回転杭の変動量と回転杭の回転トルクを含む杭情報を計測する計測工程と、予め設定した閾値に基づいて、回転トルクと偏心量の関係から杭体の正常又は異常を判断する比較工程と、杭情報に基づき、回転杭の回転圧入の条件を制御する制御工程とを備え、制御工程において、比較工程の結果に基づいて、回転杭の回転トルクを低減、又は回転を停止若しくは反転するように制御する。
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, PILE GROUP, ROTARY PILE CONSTRUCTION AND MANAGEMENT DEVICE, ROTARY PILE CONSTRUCTION AND MANAGEMENT SYSTEM
PROCÉDÉ DE CONSTRUCTION DE PIEU ROTATIF, PROCÉDÉ DE FABRICATION DE GROUPE DE PIEUX, GROUPE DE PIEUX, DISPOSITIF DE CONSTRUCTION ET DE GESTION DE PIEUX ROTATIFS, SYSTÈME DE CONSTRUCTION ET DE GESTION DE PIEUX ROTATIFS
回転杭の施工方法、杭群の製造方法、杭群、回転杭の施工管理装置、及び回転杭の施工管理システム
SAWAISHI MASAMICHI (author) / OKI HITOSHI (author) / FUKUMURA KOKA (author) / SHOJI TOMOYUKI (author)
2020-10-29
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, AND PILE GROUP
European Patent Office | 2020
|ROTARY PILE, CONSTRUCTION TOOL FOR ROTARY PILE, AND CONSTRUCTION METHOD OF ROTARY PILE
European Patent Office | 2020
|CONSTRUCTION JIG OF ROTARY PILE, AND CONSTRUCTION METHOD OF ROTARY PILE
European Patent Office | 2020
|