BRIDGE PIER CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a bridge pier construction method capable of safely constructing a bridge pier using a simple rotating device regardless of a size thereof.SOLUTION: A bridge pier construction method for integrally constructing a bridge pier 1 with girder sections 14 and 14 extended from a head section 12 thereof comprises the processes to: construct a leg section 11 of the bridge pier; install a lower falsework frame 3 which encloses the leg section; attach a rotation device 4; install a plurality of jack sections (51 and 52) extendable in a vertical direction; enable the extended jack sections to support an upper falsework frame 6 to construct the head section of the bridge pier; construct the head section and extended sections; rotate the head section and the extended sections with the rotation device; construction a connection section connecting the head section and the leg section; and remove the upper falsework frame, the rotation device and the lower falsework frame.SELECTED DRAWING: Figure 1
【課題】橋脚の規模に関わらず簡易な回転装置を使って安全に施工することができる橋脚の構築方法を提供する。【解決手段】橋脚1の頭部12から張り出される梁部14,14が一体に構築される橋脚の構築方法である。そして、橋脚の脚部11を構築する工程と、脚部を囲繞する下支保フレーム3を設置する工程と、回転装置4を取り付ける工程と、鉛直方向に伸縮自在な複数のジャッキ部(51,52)を設置する工程と、橋脚の頭部を構築するための上支保フレーム6を伸長されたジャッキ部に支持させる工程と、頭部及び張出し部を構築する工程と、回転装置によって頭部及び張出し部を回転移動させる工程と、頭部と脚部との間を連結する接続部を構築する工程と、上支保フレーム、回転装置及び下支保フレームを撤去する工程とを備えている。【選択図】図1
BRIDGE PIER CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a bridge pier construction method capable of safely constructing a bridge pier using a simple rotating device regardless of a size thereof.SOLUTION: A bridge pier construction method for integrally constructing a bridge pier 1 with girder sections 14 and 14 extended from a head section 12 thereof comprises the processes to: construct a leg section 11 of the bridge pier; install a lower falsework frame 3 which encloses the leg section; attach a rotation device 4; install a plurality of jack sections (51 and 52) extendable in a vertical direction; enable the extended jack sections to support an upper falsework frame 6 to construct the head section of the bridge pier; construct the head section and extended sections; rotate the head section and the extended sections with the rotation device; construction a connection section connecting the head section and the leg section; and remove the upper falsework frame, the rotation device and the lower falsework frame.SELECTED DRAWING: Figure 1
【課題】橋脚の規模に関わらず簡易な回転装置を使って安全に施工することができる橋脚の構築方法を提供する。【解決手段】橋脚1の頭部12から張り出される梁部14,14が一体に構築される橋脚の構築方法である。そして、橋脚の脚部11を構築する工程と、脚部を囲繞する下支保フレーム3を設置する工程と、回転装置4を取り付ける工程と、鉛直方向に伸縮自在な複数のジャッキ部(51,52)を設置する工程と、橋脚の頭部を構築するための上支保フレーム6を伸長されたジャッキ部に支持させる工程と、頭部及び張出し部を構築する工程と、回転装置によって頭部及び張出し部を回転移動させる工程と、頭部と脚部との間を連結する接続部を構築する工程と、上支保フレーム、回転装置及び下支保フレームを撤去する工程とを備えている。【選択図】図1
BRIDGE PIER CONSTRUCTION METHOD
橋脚の構築方法
YAMASHITA TETSUSHI (author) / HATTORI NAOMICHI (author) / IDE SHINICHI (author) / OMINE HIDEYUKI (author) / FUNAMOTO KATSUHIRO (author)
2018-03-08
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
PIER, PIER CONSTRUCTION METHOD, BRIDGE RECONSTRUCTION METHOD AND BRIDGE CONSTRUCTION METHOD
European Patent Office | 2021
|PIER AND PIER CONSTRUCTION METHOD, AND BRIDGE CONSTRUCTION METHOD