CONSTRUCTION METHOD OF COKE OVEN
PROBLEM TO BE SOLVED: To shorten the construction period of a coke oven and to reduce the construction cost of the same while maintaining construction accuracy.SOLUTION: A construction method of a coak oven comprises: installing an oven fastening hardware 6 and a protective plate 3 on a backstay 1 in advance while keeping the backstay 1 in a lying state; erecting the backstay 1 with the oven fastening hardware 6 and the protective plate 3 attached thereto in advance, on a predetermined position; marking the backstay 1 and the protective plate 3 with a brick-laying reference line; laying bricks of a brick structure 5b on the basis of the reference line; removing the protective plate 3 attached to the backstay 1 subsequent to completing laying bricks of the brick structure 5b; moving the protective plate 3 to a predetermined position; and installing an oven frame.SELECTED DRAWING: Figure 1
【課題】建設精度を維持したまま、コークス炉建設工期を短縮し、コークス炉建設費用を抑制する。【解決手段】バックステー1を寝かせた状態にて、炉締金物6、保護板3を予めバックステー1に設置し、予め炉締金物6、保護板3を取り付けたバックステー1を所定の位置に立て、煉瓦積み基準線をバックステー1、保護板3にマーキングし、基準線に基づいて、煉瓦構造物5bの煉瓦積みを行い、煉瓦構造物5bの煉瓦積みの完了後、バックステー1に設置した保護板3を取り外し、保護板3を所定の位置に移動させ、炉枠を設置するコークス炉の建設方法。【選択図】図1
CONSTRUCTION METHOD OF COKE OVEN
PROBLEM TO BE SOLVED: To shorten the construction period of a coke oven and to reduce the construction cost of the same while maintaining construction accuracy.SOLUTION: A construction method of a coak oven comprises: installing an oven fastening hardware 6 and a protective plate 3 on a backstay 1 in advance while keeping the backstay 1 in a lying state; erecting the backstay 1 with the oven fastening hardware 6 and the protective plate 3 attached thereto in advance, on a predetermined position; marking the backstay 1 and the protective plate 3 with a brick-laying reference line; laying bricks of a brick structure 5b on the basis of the reference line; removing the protective plate 3 attached to the backstay 1 subsequent to completing laying bricks of the brick structure 5b; moving the protective plate 3 to a predetermined position; and installing an oven frame.SELECTED DRAWING: Figure 1
【課題】建設精度を維持したまま、コークス炉建設工期を短縮し、コークス炉建設費用を抑制する。【解決手段】バックステー1を寝かせた状態にて、炉締金物6、保護板3を予めバックステー1に設置し、予め炉締金物6、保護板3を取り付けたバックステー1を所定の位置に立て、煉瓦積み基準線をバックステー1、保護板3にマーキングし、基準線に基づいて、煉瓦構造物5bの煉瓦積みを行い、煉瓦構造物5bの煉瓦積みの完了後、バックステー1に設置した保護板3を取り外し、保護板3を所定の位置に移動させ、炉枠を設置するコークス炉の建設方法。【選択図】図1
CONSTRUCTION METHOD OF COKE OVEN
コークス炉の建設方法
NAKAMURA TARO (author) / NAKAI YUKIYA (author)
2018-04-12
Patent
Electronic Resource
Japanese
IPC:
C10B
Zersetzende Destillation von kohlenstoffhaltigen Stoffen zur Erzeugung von Gas, Koks, Teer oder ähnlichen Stoffen
,
DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
F27D
Einzelheiten oder Zubehör für Industrieöfen, Schachtöfen, Brennöfen oder Retorten, soweit sie nicht auf eine Ofenart eingeschränkt sind
,
DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
COKE OVEN TEMPORARY SUPERSTRUCTURE AND CONSTRUCTION METHOD OF COKE OVEN
European Patent Office | 2015
|Engineering Index Backfile | 1906
|METHOD FOR CONSTRUCTION OF COKE OVEN AND TEMPORARY SHED FOR CONSTRUCTION OF COKE OVEN
European Patent Office | 2019
|