A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR COKE OVEN
To provide a construction method for a coke oven that allows use of electric train tracks even during construction.SOLUTION: A method of constructing a coke oven at a planned construction site PS, that also serves as an existing coke oven, lined up in a first direction X with respect to electric train rails 13 comprises a first step of installing a temporary shed 20 to cover the planned construction site PS, wherein a first side part 22 of the temporary shed 20 located on the electric train rail 13 side with respect to the planned construction site PS along the first direction X comprises a support pillar 26 that receives load of the temporary shed 20, the support pillar 26 is located on the opposite side of the planned construction site PS across the electric train rails 13 in the first direction X, and the temporary shed 20 comprises a partition wall 24 that partitions the inside of the temporary shed 20 into a work space S1 including the planned construction site PS and a passage space S2 through which a fire engine 12 running on the electric train rails 13 passes.SELECTED DRAWING: Figure 2
【課題】建設時においても電車軌条を使用可能なコークス炉の建設方法を提供する。【解決手段】既設コークス炉と兼用する電車軌条13に対して第1方向Xに並ぶ建設予定地PSにコークス炉を建設する方法であって、建設予定地PSを覆う仮設上屋20を設置する第1工程を含み、仮設上屋20のうち、第1方向Xに沿って、建設予定地PSに対して電車軌条13側に位置する第1の側部22は、仮設上屋20の荷重を受ける支柱26を備え、支柱26は、電車軌条13を第1方向Xに挟んで建設予定地PSの反対側に位置し、仮設上屋20は、仮設上屋20の内部を、建設予定地PSを含む作業空間S1と、電車軌条13上を走行する消火車12が通過する通路空間S2と、に区画する区画壁24を備える。【選択図】図2
CONSTRUCTION METHOD FOR COKE OVEN
To provide a construction method for a coke oven that allows use of electric train tracks even during construction.SOLUTION: A method of constructing a coke oven at a planned construction site PS, that also serves as an existing coke oven, lined up in a first direction X with respect to electric train rails 13 comprises a first step of installing a temporary shed 20 to cover the planned construction site PS, wherein a first side part 22 of the temporary shed 20 located on the electric train rail 13 side with respect to the planned construction site PS along the first direction X comprises a support pillar 26 that receives load of the temporary shed 20, the support pillar 26 is located on the opposite side of the planned construction site PS across the electric train rails 13 in the first direction X, and the temporary shed 20 comprises a partition wall 24 that partitions the inside of the temporary shed 20 into a work space S1 including the planned construction site PS and a passage space S2 through which a fire engine 12 running on the electric train rails 13 passes.SELECTED DRAWING: Figure 2
【課題】建設時においても電車軌条を使用可能なコークス炉の建設方法を提供する。【解決手段】既設コークス炉と兼用する電車軌条13に対して第1方向Xに並ぶ建設予定地PSにコークス炉を建設する方法であって、建設予定地PSを覆う仮設上屋20を設置する第1工程を含み、仮設上屋20のうち、第1方向Xに沿って、建設予定地PSに対して電車軌条13側に位置する第1の側部22は、仮設上屋20の荷重を受ける支柱26を備え、支柱26は、電車軌条13を第1方向Xに挟んで建設予定地PSの反対側に位置し、仮設上屋20は、仮設上屋20の内部を、建設予定地PSを含む作業空間S1と、電車軌条13上を走行する消火車12が通過する通路空間S2と、に区画する区画壁24を備える。【選択図】図2
CONSTRUCTION METHOD FOR COKE OVEN
コークス炉の建設方法
NAKASUGI HIROKI (author) / WATANABE TOICHIRO (author) / KAWAKAMI SHINSAKU (author)
2023-10-06
Patent
Electronic Resource
Japanese
IPC:
C10B
Zersetzende Destillation von kohlenstoffhaltigen Stoffen zur Erzeugung von Gas, Koks, Teer oder ähnlichen Stoffen
,
DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
COKE OVEN TEMPORARY SUPERSTRUCTURE AND CONSTRUCTION METHOD OF COKE OVEN
European Patent Office | 2015
|Engineering Index Backfile | 1906
|METHOD FOR CONSTRUCTION OF COKE OVEN AND TEMPORARY SHED FOR CONSTRUCTION OF COKE OVEN
European Patent Office | 2019
|