RECONSTRUCTION METHOD OF UNDERGROUND SKELETON
PROBLEM TO BE SOLVED: To provide a reconstruction method of an underground skeleton that does not require an earth bracing.SOLUTION: A reconstruction method of an underground skeleton comprises: a first removal process of removing an existing underground skeleton (underground skeleton 50B) leaving an outer peripheral portion 50E; a construction process of constructing a new underground skeleton (underground skeleton 10B) in the space where the existing underground skeleton has been removed; a connecting process of connecting an underground outer wall 52 of the outer peripheral portion 50E and the new underground skeleton with a new beam 16; and a second removal process of removing the outer peripheral portion 50E leaving the underground outer wall 52.SELECTED DRAWING: Figure 7
【課題】山留を必要としない地下躯体の改築方法を提供する。【解決手段】地下躯体の改築方法は、外周部50Eを残して既存地下躯体(地下躯体50B)を撤去する第1撤去工程と、既存地下躯体が撤去された空間に新設地下躯体(地下躯体10B)を構築する構築工程と、外周部50Eの地下外壁52と新設地下躯体とを新設梁16で連結する連結工程と、地下外壁52を残して外周部50Eを撤去する第2撤去工程と、を備えている。【選択図】図7
RECONSTRUCTION METHOD OF UNDERGROUND SKELETON
PROBLEM TO BE SOLVED: To provide a reconstruction method of an underground skeleton that does not require an earth bracing.SOLUTION: A reconstruction method of an underground skeleton comprises: a first removal process of removing an existing underground skeleton (underground skeleton 50B) leaving an outer peripheral portion 50E; a construction process of constructing a new underground skeleton (underground skeleton 10B) in the space where the existing underground skeleton has been removed; a connecting process of connecting an underground outer wall 52 of the outer peripheral portion 50E and the new underground skeleton with a new beam 16; and a second removal process of removing the outer peripheral portion 50E leaving the underground outer wall 52.SELECTED DRAWING: Figure 7
【課題】山留を必要としない地下躯体の改築方法を提供する。【解決手段】地下躯体の改築方法は、外周部50Eを残して既存地下躯体(地下躯体50B)を撤去する第1撤去工程と、既存地下躯体が撤去された空間に新設地下躯体(地下躯体10B)を構築する構築工程と、外周部50Eの地下外壁52と新設地下躯体とを新設梁16で連結する連結工程と、地下外壁52を残して外周部50Eを撤去する第2撤去工程と、を備えている。【選択図】図7
RECONSTRUCTION METHOD OF UNDERGROUND SKELETON
地下躯体の改築方法
YOSHIDA RYOSUKE (author) / ISHIKAWA TOMOAKI (author) / WADA JUNICHI (author) / ODAJIMA NOBUYUKI (author)
2018-04-26
Patent
Electronic Resource
Japanese
RECONSTRUCTION METHOD OF CONCRETE CONSTRUCTION WITH UNDERGROUND SKELETON
European Patent Office | 2018
|