METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
PROBLEM TO BE SOLVED: To provide a method for constructing cast-in-place concrete capable of suitably constructing cast-in-place concrete piles without causing strength deterioration even when high-strength concrete is used.SOLUTION: A method for constructing a cast-in-pile concrete pile comprises a preceding concrete placing step of inserting a tremie pipe 2 into a pilot hole 1 filled with stabilizing solution 4, pouring the concrete 3 exhibiting a strength equal to or more than 4/3 times the ultimate end bearing capacity of the ground G from the tremie pipe 2, pushing out the stabilizing solution 4 and placing it into a bottom part 1a side of the pilot hole 1 and a high-strength concrete placing step of pouring high-strength concrete 5 having higher strength than the concrete 3 and placing it into the pile hole 1 from the tremie pipe 2 having a tip inserted into the concrete 3 after a top end of the concrete 3 cast by the preceding concrete placing step has reached a preset predetermined height position h above a concrete outlet 2a at the tip of the tremie pipe 2.SELECTED DRAWING: Figure 2
【課題】高強度コンクリートを用いた場合であっても強度低下を招くことなく好適に場所打ちコンクリート杭を構築することを可能にする場所打ちコンクリートの施工方法を提供する。【解決手段】安定液4で満たされた杭孔1にトレミー管2を挿入し、地盤Gの極限先端支持力度の4/3倍以上の強度を発現するコンクリート3を、トレミー管2から流し込みつつ安定液4を押し出して杭孔1の底部1a側に打設する先行コンクリート打設工程と、先行コンクリート打設工程によって打設したコンクリート3の天端がトレミー管2の先端のコンクリート吐出口2aよりも上方の予め設定した所定の高さ位置hに達した後に、コンクリート3中に先端を入れたトレミー管2から前記コンクリート3よりも高強度となる高強度コンクリート5を流し込んで杭孔1に打設する高強度コンクリート打設工程とを備える。【選択図】図2
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
PROBLEM TO BE SOLVED: To provide a method for constructing cast-in-place concrete capable of suitably constructing cast-in-place concrete piles without causing strength deterioration even when high-strength concrete is used.SOLUTION: A method for constructing a cast-in-pile concrete pile comprises a preceding concrete placing step of inserting a tremie pipe 2 into a pilot hole 1 filled with stabilizing solution 4, pouring the concrete 3 exhibiting a strength equal to or more than 4/3 times the ultimate end bearing capacity of the ground G from the tremie pipe 2, pushing out the stabilizing solution 4 and placing it into a bottom part 1a side of the pilot hole 1 and a high-strength concrete placing step of pouring high-strength concrete 5 having higher strength than the concrete 3 and placing it into the pile hole 1 from the tremie pipe 2 having a tip inserted into the concrete 3 after a top end of the concrete 3 cast by the preceding concrete placing step has reached a preset predetermined height position h above a concrete outlet 2a at the tip of the tremie pipe 2.SELECTED DRAWING: Figure 2
【課題】高強度コンクリートを用いた場合であっても強度低下を招くことなく好適に場所打ちコンクリート杭を構築することを可能にする場所打ちコンクリートの施工方法を提供する。【解決手段】安定液4で満たされた杭孔1にトレミー管2を挿入し、地盤Gの極限先端支持力度の4/3倍以上の強度を発現するコンクリート3を、トレミー管2から流し込みつつ安定液4を押し出して杭孔1の底部1a側に打設する先行コンクリート打設工程と、先行コンクリート打設工程によって打設したコンクリート3の天端がトレミー管2の先端のコンクリート吐出口2aよりも上方の予め設定した所定の高さ位置hに達した後に、コンクリート3中に先端を入れたトレミー管2から前記コンクリート3よりも高強度となる高強度コンクリート5を流し込んで杭孔1に打設する高強度コンクリート打設工程とを備える。【選択図】図2
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
場所打ちコンクリート杭の施工方法
MANO HIDEYUKI (author) / KANNO MITSUTOSHI (author) / KURODA YASUHIRO (author) / TOZAWA MASAMI (author) / INOUE SHINSUKE (author) / TAKEHARA NAOKI (author) / ABE KAZUSHIGE (author)
2018-08-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE, AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2023
|TUBE FOR CONSTRUCTING KNOTTED PILE OF CAST-IN-PLACE CONCRETE
European Patent Office | 2016
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|