METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
To provide a method for constructing a cast-in-place concrete pile capable of easily removing an extra fill part without performing a crushing work.SOLUTION: A method for constructing a cast-in-place concrete pile includes the steps of: placing super retarded concrete 22 obtained by mixing concrete with a super retardant into a pile head 18 and an installation scheduled place of an extra fill part 20 thereon, and constructing the pile head 18 and the extra fill part 20 formed from the super retarded concrete 22; removing the super retarded concrete 22 of the extra fill part 20 before the start of curing the super retarded concrete 22 of the extra fill part 20; and inserting a connection member for connecting the pile head 18 and a structure installed above the pile into the super retarded concrete 22 of the pile head 18 before the start of curing the super retarded concrete 22 of the pile head 18 after having removed the super retarded concrete 22 of the extra fill part 20.SELECTED DRAWING: Figure 1
【課題】砕り作業を行わずに余盛部を容易に除去することのできる場所打ちコンクリート杭の施工方法を提供する。【解決手段】場所打ちコンクリート杭を施工する方法であって、杭頭部18とその上の余盛部20の設置予定箇所に、コンクリートに超遅延剤を混入してなる超遅延コンクリート22を打設して、超遅延コンクリート22からなる杭頭部18と余盛部20を構築するステップと、余盛部20の超遅延コンクリート22の硬化開始前に、余盛部20の超遅延コンクリート22を除去するステップと、余盛部20の超遅延コンクリート22を除去した後、杭頭部18の超遅延コンクリート22の硬化開始前に、杭頭部18と杭の上部に設置される構造物とを連結するための連結部材を杭頭部18の超遅延コンクリート22の中に挿入するステップとを備えるようにする。【選択図】図1
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
To provide a method for constructing a cast-in-place concrete pile capable of easily removing an extra fill part without performing a crushing work.SOLUTION: A method for constructing a cast-in-place concrete pile includes the steps of: placing super retarded concrete 22 obtained by mixing concrete with a super retardant into a pile head 18 and an installation scheduled place of an extra fill part 20 thereon, and constructing the pile head 18 and the extra fill part 20 formed from the super retarded concrete 22; removing the super retarded concrete 22 of the extra fill part 20 before the start of curing the super retarded concrete 22 of the extra fill part 20; and inserting a connection member for connecting the pile head 18 and a structure installed above the pile into the super retarded concrete 22 of the pile head 18 before the start of curing the super retarded concrete 22 of the pile head 18 after having removed the super retarded concrete 22 of the extra fill part 20.SELECTED DRAWING: Figure 1
【課題】砕り作業を行わずに余盛部を容易に除去することのできる場所打ちコンクリート杭の施工方法を提供する。【解決手段】場所打ちコンクリート杭を施工する方法であって、杭頭部18とその上の余盛部20の設置予定箇所に、コンクリートに超遅延剤を混入してなる超遅延コンクリート22を打設して、超遅延コンクリート22からなる杭頭部18と余盛部20を構築するステップと、余盛部20の超遅延コンクリート22の硬化開始前に、余盛部20の超遅延コンクリート22を除去するステップと、余盛部20の超遅延コンクリート22を除去した後、杭頭部18の超遅延コンクリート22の硬化開始前に、杭頭部18と杭の上部に設置される構造物とを連結するための連結部材を杭頭部18の超遅延コンクリート22の中に挿入するステップとを備えるようにする。【選択図】図1
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE
場所打ちコンクリート杭の施工方法
MAEDA NOBUYUKI (author)
2018-12-06
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR CONSTRUCTING CAST-IN-PLACE CONCRETE PILE, AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2023
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|TUBE FOR CONSTRUCTING KNOTTED PILE OF CAST-IN-PLACE CONCRETE
European Patent Office | 2016
|