A platform for research: civil engineering, architecture and urbanism
MEASUREMENT MANAGEMENT SYSTEM, CONSTRUCTION SUPPORT SYSTEM, MEASUREMENT MANAGEMENT METHOD, AND CONSTRUCTION SUPPORT METHOD
PROBLEM TO BE SOLVED: To provide a measurement management system, a construction support system, a measurement management method, and a construction support method capable of detecting failures caused by the transmitting and receiving of measurement results for construction while checking measurement results.SOLUTION: Time information regarding measurement time is included in measurement results information regarding measurement results obtained by a measurement device 100 for measuring displacement of a track 120a. A communication abnormality is determined when a first time comparison result from the comparison of time information regarding actual measurement result information stored in a storage part 22 and time information regarding received measurement result information received by a transmitting-receiving part 34 is greater than a first prescribed time. A communication abnormality is determined when a second time comparison result from the comparison of time information for stored measurement result information and measurement time is greater than a second prescribed time.SELECTED DRAWING: Figure 2
【課題】本発明は、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出できる計測管理システム、施工支援システム、計測管理方法及び施工支援方法を提供することを目的とする。【解決手段】軌道120aの変位を計測する計測装置100による計測結果に関する計測結果情報には計測時刻に関する時刻情報が含まれ、記憶部22に格納された実計測結果情報の時刻情報と送受信部34が受信した受信計測結果情報の時刻情報とを比較した第一時刻比較結果が第一の所定時間以上である場合に通信異常と判定し、格納計測結果情報の時刻情報と計測時刻とを比較した第二時刻比較結果が第二の所定時間以上である場合に通信異常と判定する構成とした。【選択図】図2
MEASUREMENT MANAGEMENT SYSTEM, CONSTRUCTION SUPPORT SYSTEM, MEASUREMENT MANAGEMENT METHOD, AND CONSTRUCTION SUPPORT METHOD
PROBLEM TO BE SOLVED: To provide a measurement management system, a construction support system, a measurement management method, and a construction support method capable of detecting failures caused by the transmitting and receiving of measurement results for construction while checking measurement results.SOLUTION: Time information regarding measurement time is included in measurement results information regarding measurement results obtained by a measurement device 100 for measuring displacement of a track 120a. A communication abnormality is determined when a first time comparison result from the comparison of time information regarding actual measurement result information stored in a storage part 22 and time information regarding received measurement result information received by a transmitting-receiving part 34 is greater than a first prescribed time. A communication abnormality is determined when a second time comparison result from the comparison of time information for stored measurement result information and measurement time is greater than a second prescribed time.SELECTED DRAWING: Figure 2
【課題】本発明は、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出できる計測管理システム、施工支援システム、計測管理方法及び施工支援方法を提供することを目的とする。【解決手段】軌道120aの変位を計測する計測装置100による計測結果に関する計測結果情報には計測時刻に関する時刻情報が含まれ、記憶部22に格納された実計測結果情報の時刻情報と送受信部34が受信した受信計測結果情報の時刻情報とを比較した第一時刻比較結果が第一の所定時間以上である場合に通信異常と判定し、格納計測結果情報の時刻情報と計測時刻とを比較した第二時刻比較結果が第二の所定時間以上である場合に通信異常と判定する構成とした。【選択図】図2
MEASUREMENT MANAGEMENT SYSTEM, CONSTRUCTION SUPPORT SYSTEM, MEASUREMENT MANAGEMENT METHOD, AND CONSTRUCTION SUPPORT METHOD
計測管理システム、施工支援システム、計測管理方法及び施工支援方法
NAGAO TATSUJI (author) / OKABE YOSHIO (author) / SAITO MASAHARU (author) / KUWABARA KIYOSHI (author) / OTANAKA TATSUKI (author) / NAGANO YUICHI (author)
2018-09-13
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
CONSTRUCTION SUPPORT DEVICE, CONSTRUCTION SUPPORT METHOD AND COMPACTION TIMING MANAGEMENT SYSTEM
European Patent Office | 2024
|