CONSTRUCTION SUPPORT DEVICE, CONSTRUCTION SUPPORT METHOD AND COMPACTION TIMING MANAGEMENT SYSTEM
To provide a construction support device, a construction support method, and a compaction timing management system that enable appropriate determination of the compaction timing of asphalt mixture layers.SOLUTION: A construction support device for asphalt pavement, in which an asphalt mixture layer is compacted after being laid and leveled, includes an acquisition unit 312 that acquires multiple parameters including weather conditions, the temperature of the asphalt mixture before it has been laid and leveled, and the void ratio of the asphalt mixture after it has been laid and leveled, and a temperature estimation unit 40 that estimates the internal temperature of the asphalt mixture layer based on the parameters acquired by the acquisition unit 312.SELECTED DRAWING: Figure 2
【課題】アスファルト混合物層の転圧時期を適切に判断することを可能とする施工支援装置、施工支援方法、及び、転圧時期管理システムを提供する。【解決手段】敷き均し後のアスファルト混合物層を転圧するアスファルト舗装における施工支援装置において、気象条件、アスファルト混合物の敷き均し前の温度、及び、アスファルト混合物の敷き均し後の空隙率を含む複数のパラメータを取得する取得部312と、取得部312により取得されたパラメータに基づいて、アスファルト混合物層の内部の温度を推定する温度推定部40と、を備える。【選択図】図2
CONSTRUCTION SUPPORT DEVICE, CONSTRUCTION SUPPORT METHOD AND COMPACTION TIMING MANAGEMENT SYSTEM
To provide a construction support device, a construction support method, and a compaction timing management system that enable appropriate determination of the compaction timing of asphalt mixture layers.SOLUTION: A construction support device for asphalt pavement, in which an asphalt mixture layer is compacted after being laid and leveled, includes an acquisition unit 312 that acquires multiple parameters including weather conditions, the temperature of the asphalt mixture before it has been laid and leveled, and the void ratio of the asphalt mixture after it has been laid and leveled, and a temperature estimation unit 40 that estimates the internal temperature of the asphalt mixture layer based on the parameters acquired by the acquisition unit 312.SELECTED DRAWING: Figure 2
【課題】アスファルト混合物層の転圧時期を適切に判断することを可能とする施工支援装置、施工支援方法、及び、転圧時期管理システムを提供する。【解決手段】敷き均し後のアスファルト混合物層を転圧するアスファルト舗装における施工支援装置において、気象条件、アスファルト混合物の敷き均し前の温度、及び、アスファルト混合物の敷き均し後の空隙率を含む複数のパラメータを取得する取得部312と、取得部312により取得されたパラメータに基づいて、アスファルト混合物層の内部の温度を推定する温度推定部40と、を備える。【選択図】図2
CONSTRUCTION SUPPORT DEVICE, CONSTRUCTION SUPPORT METHOD AND COMPACTION TIMING MANAGEMENT SYSTEM
施工支援装置、施工支援方法、及び、転圧時期管理システム
KAJIWARA SATORU (author) / MONDEN SEIYA (author) / AIDA TAKASHI (author)
2024-06-26
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
CONSTRUCTION METHOD OF STATIC PRESS-IN COMPACTION TECHNIQUE, AND CONSTRUCTION SUPPORT SYSTEM
European Patent Office | 2016
|European Patent Office | 2018
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT METHOD
European Patent Office | 2024
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT METHOD
European Patent Office | 2024
|CONSTRUCTION SUPPORT DEVICE AND CONSTRUCTION SUPPORT METHOD