A platform for research: civil engineering, architecture and urbanism
POST-PROCESS ANCHOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a post-process anchor construction method which can prevent an opening end portion of a perforation formed in the existing structure and its vicinity from being damaged by the pressure from an anchor bar.SOLUTION: An anchor material has a plate-shaped flange portion 1b extending in a direction intersecting a bar-shaped anchor bar 1a. The anchor bar 1a has an in-perforation arrangement portion 1e and a projecting portion. The flange portion 1b is formed in an annular shape. When assuming a straight line S1 connecting an outer peripheral end portion of the flange portion 1b located at a position where a linear distance between an axis L of the anchor bar 1a and the outer peripheral end portion of the flange portion 1b becomes the shortest and the axis L of the anchor bar 1a, the linear distance between the outer peripheral end portion of the flange portion 1b and the axis L is 2.5 times or more as large as the linear distance between an outer peripheral end portion of the anchor bar 1a and the axis L, and the thickness of the flange portion 1b is 3 mm or more and 15 mm or less. A post-process anchor construction method comprises an anchor material arrangement step and an inorganic filler filling step, so that the entire flange portion 1b is buried in an inorganic filler within a perforation.SELECTED DRAWING: Figure 5
【課題】既存の構造物に形成された穿孔の開孔端部やその近傍がアンカー筋からの圧力によって破損してしまうのを抑制できるあと施工アンカー工法を提供する。【解決手段】アンカー材は、棒状のアンカー筋1aと交差する方向に延びる板状のフランジ部1bとを備え、アンカー筋1aは、穿孔内配置部1eと突出部とを備え、フランジ部1bは、環状に形成され、アンカー筋1aの軸線Lとフランジ部1bの外周端部との間の直線距離が最短になる場所に位置するフランジ部1bの外周端部とアンカー筋1aの軸線Lとを結ぶ直線S1を仮定した際に、フランジ部1bの外周端部と軸線Lとの間の直線距離は、アンカー筋1aの外周端部と軸線Lとの間の直線距離に対して2.5倍以上であり、フランジ部1bの厚みは、3mm以上15mm以下で、アンカー材配置工程と、無機系充填材充填工程とを備え、フランジ部1bの全体が穿孔内で無機系充填材に埋没するようにする。【選択図】図5
POST-PROCESS ANCHOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a post-process anchor construction method which can prevent an opening end portion of a perforation formed in the existing structure and its vicinity from being damaged by the pressure from an anchor bar.SOLUTION: An anchor material has a plate-shaped flange portion 1b extending in a direction intersecting a bar-shaped anchor bar 1a. The anchor bar 1a has an in-perforation arrangement portion 1e and a projecting portion. The flange portion 1b is formed in an annular shape. When assuming a straight line S1 connecting an outer peripheral end portion of the flange portion 1b located at a position where a linear distance between an axis L of the anchor bar 1a and the outer peripheral end portion of the flange portion 1b becomes the shortest and the axis L of the anchor bar 1a, the linear distance between the outer peripheral end portion of the flange portion 1b and the axis L is 2.5 times or more as large as the linear distance between an outer peripheral end portion of the anchor bar 1a and the axis L, and the thickness of the flange portion 1b is 3 mm or more and 15 mm or less. A post-process anchor construction method comprises an anchor material arrangement step and an inorganic filler filling step, so that the entire flange portion 1b is buried in an inorganic filler within a perforation.SELECTED DRAWING: Figure 5
【課題】既存の構造物に形成された穿孔の開孔端部やその近傍がアンカー筋からの圧力によって破損してしまうのを抑制できるあと施工アンカー工法を提供する。【解決手段】アンカー材は、棒状のアンカー筋1aと交差する方向に延びる板状のフランジ部1bとを備え、アンカー筋1aは、穿孔内配置部1eと突出部とを備え、フランジ部1bは、環状に形成され、アンカー筋1aの軸線Lとフランジ部1bの外周端部との間の直線距離が最短になる場所に位置するフランジ部1bの外周端部とアンカー筋1aの軸線Lとを結ぶ直線S1を仮定した際に、フランジ部1bの外周端部と軸線Lとの間の直線距離は、アンカー筋1aの外周端部と軸線Lとの間の直線距離に対して2.5倍以上であり、フランジ部1bの厚みは、3mm以上15mm以下で、アンカー材配置工程と、無機系充填材充填工程とを備え、フランジ部1bの全体が穿孔内で無機系充填材に埋没するようにする。【選択図】図5
POST-PROCESS ANCHOR CONSTRUCTION METHOD
あと施工アンカー工法
ANDO SHIGEHIRO (author) / TAMURA TSUTOMU (author) / KANEYOSHI TAKAMASA (author)
2018-11-08
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2016
|POST-CONSTRUCTION ANCHOR AND POST-CONSTRUCTION ANCHOR BUSHING
European Patent Office | 2021
|European Patent Office | 2017
|POST-INSTALLED ANCHOR, POST-INSTALLED ANCHOR CONSTRUCTION METHOD, AND POST-INSTALLED ANCHOR SYSTEM
European Patent Office | 2016
|