A platform for research: civil engineering, architecture and urbanism
POST-CONSTRUCTION ANCHOR, CONSTRUCTION METHOD FOR POST-CONSTRUCTION ANCHOR METHOD, AND ANCHORING SYSTEM
[Problem] To provide a post-construction anchor for which an expanding portion can be reliably expanded in an expanded diameter portion and so as to match the shape of the expanded diameter portion. [Solution] A sleeve impact type post-construction anchor 10 that is anchored in an anchor hole 1 in which an expanded diameter portion 4 is formed at a position at a prescribed depth in a pilot hole 3 comprises: a sleeve unit 11 having an expanding portion 22 on the distal end; an anchor body 12 that is inserted into the sleeve unit 11 and that has male threads 12a formed on at least the distal end; and a cone portion 13 that has a tapered portion 13a to expand the expanding portion 22 and that screws onto the distal end of the anchor body 12 so that the position thereof is adjustable. The cone portion 13 is formed in the axial direction to a length corresponding to the length of the expanded diameter portion 4 and to be longer than the distance from the bottom 3c of the pilot hole 3 to the bottom part 4a of the expanded diameter portion 4.
Le but de l'invention est de fournir un ancrage post-construction pour lequel une portion d'expansion peut être dilatée de manière fiable dans une partie à diamètre élargi de manière à suivre la forme de la partie à diamètre élargi. A cette fin, un ancrage de post-construction de type manchon à impact 10, qui est ancré dans un trou d'ancrage 1 dans lequel une partie à diamètre élargi 4 est formée au niveau d'une position à une profondeur prescrite dans un trou pilote 3 comprend: une unité manchon 11 ayant une partie d'expansion 22 sur l'extrémité distale; un corps d'ancrage 12 qui est inséré dans l'unité manchon 11 et qui possède des filets mâles 12a formés sur au moins l'extrémité distale; et une partie de cône 13 qui présente une partie conique 13a pour dilater la partie d'expansion 22 et qui se visse sur l'extrémité distale du corps d'ancrage 12 de sorte que sa position est réglable. La partie conique 13 est formée dans la direction axiale sur une longueur correspondant à la longueur de la partie à diamètre élargi 4 et de manière à être plus longue que la distance depuis le fond 3c du trou pilote 3 jusqu'à la partie fond 4a de la partie à diamètre élargi 4.
【課題】拡開部を、拡径部内で且つ拡径部の形状に合わせて確実に拡開させることができる後施工アンカー等を提供する。 【解決手段】下穴3の所定の深さ位置に拡径部4を形成したアンカー穴1に定着されるスリーブ打込み式の後施工アンカー10であって、先端側に拡開部22を有するスリーブ部11と、スリーブ部11に挿通され、少なくとも先端側に雄ネジ12aを形成したアンカー本体12と、拡開部22を拡開させるテーパー部13aを有すると共に、アンカー本体12の先端側に位置調整自在に螺合したコーン部13と、を備え、コーン部13は、軸方向において、拡径部4の長さに対応する長さに形成され且つ下穴3の穴底3cから拡径部4の底部位4aまでの距離よりも長く形成されている。
POST-CONSTRUCTION ANCHOR, CONSTRUCTION METHOD FOR POST-CONSTRUCTION ANCHOR METHOD, AND ANCHORING SYSTEM
[Problem] To provide a post-construction anchor for which an expanding portion can be reliably expanded in an expanded diameter portion and so as to match the shape of the expanded diameter portion. [Solution] A sleeve impact type post-construction anchor 10 that is anchored in an anchor hole 1 in which an expanded diameter portion 4 is formed at a position at a prescribed depth in a pilot hole 3 comprises: a sleeve unit 11 having an expanding portion 22 on the distal end; an anchor body 12 that is inserted into the sleeve unit 11 and that has male threads 12a formed on at least the distal end; and a cone portion 13 that has a tapered portion 13a to expand the expanding portion 22 and that screws onto the distal end of the anchor body 12 so that the position thereof is adjustable. The cone portion 13 is formed in the axial direction to a length corresponding to the length of the expanded diameter portion 4 and to be longer than the distance from the bottom 3c of the pilot hole 3 to the bottom part 4a of the expanded diameter portion 4.
Le but de l'invention est de fournir un ancrage post-construction pour lequel une portion d'expansion peut être dilatée de manière fiable dans une partie à diamètre élargi de manière à suivre la forme de la partie à diamètre élargi. A cette fin, un ancrage de post-construction de type manchon à impact 10, qui est ancré dans un trou d'ancrage 1 dans lequel une partie à diamètre élargi 4 est formée au niveau d'une position à une profondeur prescrite dans un trou pilote 3 comprend: une unité manchon 11 ayant une partie d'expansion 22 sur l'extrémité distale; un corps d'ancrage 12 qui est inséré dans l'unité manchon 11 et qui possède des filets mâles 12a formés sur au moins l'extrémité distale; et une partie de cône 13 qui présente une partie conique 13a pour dilater la partie d'expansion 22 et qui se visse sur l'extrémité distale du corps d'ancrage 12 de sorte que sa position est réglable. La partie conique 13 est formée dans la direction axiale sur une longueur correspondant à la longueur de la partie à diamètre élargi 4 et de manière à être plus longue que la distance depuis le fond 3c du trou pilote 3 jusqu'à la partie fond 4a de la partie à diamètre élargi 4.
【課題】拡開部を、拡径部内で且つ拡径部の形状に合わせて確実に拡開させることができる後施工アンカー等を提供する。 【解決手段】下穴3の所定の深さ位置に拡径部4を形成したアンカー穴1に定着されるスリーブ打込み式の後施工アンカー10であって、先端側に拡開部22を有するスリーブ部11と、スリーブ部11に挿通され、少なくとも先端側に雄ネジ12aを形成したアンカー本体12と、拡開部22を拡開させるテーパー部13aを有すると共に、アンカー本体12の先端側に位置調整自在に螺合したコーン部13と、を備え、コーン部13は、軸方向において、拡径部4の長さに対応する長さに形成され且つ下穴3の穴底3cから拡径部4の底部位4aまでの距離よりも長く形成されている。
POST-CONSTRUCTION ANCHOR, CONSTRUCTION METHOD FOR POST-CONSTRUCTION ANCHOR METHOD, AND ANCHORING SYSTEM
ANCRAGE POST-CONSTRUCTION, PROCÉDÉ DE CONSTRUCTION POUR PROCÉDÉ D'ANCRAGE POST-CONSTRUCTION, ET SYSTÈME D'ANCRAGE
後施工アンカー、後施工アンカーの施工方法およびアンカーリングシステム
FUJITA SHOGO (author)
2017-08-31
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2016
|POST-CONSTRUCTION ANCHOR AND POST-CONSTRUCTION ANCHOR BUSHING
European Patent Office | 2021
|POST-INSTALLED ANCHOR, POST-INSTALLED ANCHOR CONSTRUCTION METHOD, AND POST-INSTALLED ANCHOR SYSTEM
European Patent Office | 2016
|