A platform for research: civil engineering, architecture and urbanism
JOINT OF LAYING IRON PLATE FOR CONSTRUCTION SITE
PROBLEM TO BE SOLVED: To provide a joint of iron plate for construction site that can reduce frequency of base part replacement and save resources.SOLUTION: A nut mounting recess 13 is formed in the center of a lower side of a base part 10. A first hole part 14 is formed to pass through a central part of a base part 10 on the upper surface of the nut mounting recess part 13. A nut 40 is replaceably fitted in the nut mounting recess 13 from the lower surface side of the base portion 10. For example, in the case of using a seating nut having a washer portion 41 as the nut 40, the nut 40 is fitted into the nut mounting recess 13 from the lower surface side of the base part 10 with its washer part 41 facing downward. When a cup part 20 is put on the base part 10, a bolt 30 is screwed into the nut 40 from the upper surface side of the cup part 20 via a second hole part 22 and the first hole part 14.SELECTED DRAWING: Figure 3
【課題】ベース部の交換頻度を低減し、資源の節約を図ることができる建設現場用敷き鉄板のジョイントを提供する。【解決手段】ナット装着用凹部13は、ベース部10の下側の中央部に形成されている。第一孔部14は、ナット装着用凹部13の上面においてベース部10の中心部を貫通するように形成されている。ナット40は、ベース部10の下面側からナット装着用凹部13に交換可能に嵌装される。例えば、ナット40として座金部41を有する座付きナットを用いる場合、ナット40はその座金部41を下に向けた状態でベース部10の下面側からナット装着用凹部13に嵌装される。カップ部20をベース部10に被せたときに、ボルト30が、カップ部20の上面側から第二孔部22及び第一孔部14を介してナット40にねじ込まれる。【選択図】図3
JOINT OF LAYING IRON PLATE FOR CONSTRUCTION SITE
PROBLEM TO BE SOLVED: To provide a joint of iron plate for construction site that can reduce frequency of base part replacement and save resources.SOLUTION: A nut mounting recess 13 is formed in the center of a lower side of a base part 10. A first hole part 14 is formed to pass through a central part of a base part 10 on the upper surface of the nut mounting recess part 13. A nut 40 is replaceably fitted in the nut mounting recess 13 from the lower surface side of the base portion 10. For example, in the case of using a seating nut having a washer portion 41 as the nut 40, the nut 40 is fitted into the nut mounting recess 13 from the lower surface side of the base part 10 with its washer part 41 facing downward. When a cup part 20 is put on the base part 10, a bolt 30 is screwed into the nut 40 from the upper surface side of the cup part 20 via a second hole part 22 and the first hole part 14.SELECTED DRAWING: Figure 3
【課題】ベース部の交換頻度を低減し、資源の節約を図ることができる建設現場用敷き鉄板のジョイントを提供する。【解決手段】ナット装着用凹部13は、ベース部10の下側の中央部に形成されている。第一孔部14は、ナット装着用凹部13の上面においてベース部10の中心部を貫通するように形成されている。ナット40は、ベース部10の下面側からナット装着用凹部13に交換可能に嵌装される。例えば、ナット40として座金部41を有する座付きナットを用いる場合、ナット40はその座金部41を下に向けた状態でベース部10の下面側からナット装着用凹部13に嵌装される。カップ部20をベース部10に被せたときに、ボルト30が、カップ部20の上面側から第二孔部22及び第一孔部14を介してナット40にねじ込まれる。【選択図】図3
JOINT OF LAYING IRON PLATE FOR CONSTRUCTION SITE
建設現場用敷き鉄板のジョイント
TSUKAHARA KENICHI (author)
2018-11-15
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E04G
SCAFFOLDING
,
Baugerüste
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile