A platform for research: civil engineering, architecture and urbanism
INSTALLATION METHOD OF TIMBERING
To provide an installation method of a timbering and the like capable of easily and properly installing a timbering.SOLUTION: When installing a timbering unit 10 inside a steel pipe sheet pile cutting off a water area, a bracket body 82 including a height adjusting portion 86 containing an elastic member 861 on an upper face is provided inside the steel pipe sheet pile, the timbering unit 10 to which a spacer is attached on the outside thereof is lifted down inside the steel pipe sheet pile, and the timbering unit 10 is installed on the bracket body 82. When installing the timbering unit 10, height of the height adjusting portion 86 is adjusted so that the height adjusting portion 86 comes in contact with an undersurface of the timbering unit 10 before releasing lifting support of the timbering unit 10, and then, the lifting support of the timbering unit 10 is released.SELECTED DRAWING: Figure 7
【課題】支保工を容易且つ適切に設置可能な支保工の設置方法等を提供する。【解決手段】水域を締切る鋼管矢板の内側に支保工ユニット10を設置する際に、鋼管矢板の内側に、弾性部材861を含む高さ調整部86を上面に有するブラケット本体82を設けた後、外側にスペーサを取付けた支保工ユニット10を鋼管矢板の内側で吊り降ろし、支保工ユニット10をブラケット本体82上に設置する。支保工ユニット10の設置時は、支保工ユニット10の吊り支持を解除する前に高さ調整部86の高さを調整して高さ調整部86が支保工ユニット10の下面に接するようにし、その後、支保工ユニット10の吊り支持を解除する。【選択図】図7
INSTALLATION METHOD OF TIMBERING
To provide an installation method of a timbering and the like capable of easily and properly installing a timbering.SOLUTION: When installing a timbering unit 10 inside a steel pipe sheet pile cutting off a water area, a bracket body 82 including a height adjusting portion 86 containing an elastic member 861 on an upper face is provided inside the steel pipe sheet pile, the timbering unit 10 to which a spacer is attached on the outside thereof is lifted down inside the steel pipe sheet pile, and the timbering unit 10 is installed on the bracket body 82. When installing the timbering unit 10, height of the height adjusting portion 86 is adjusted so that the height adjusting portion 86 comes in contact with an undersurface of the timbering unit 10 before releasing lifting support of the timbering unit 10, and then, the lifting support of the timbering unit 10 is released.SELECTED DRAWING: Figure 7
【課題】支保工を容易且つ適切に設置可能な支保工の設置方法等を提供する。【解決手段】水域を締切る鋼管矢板の内側に支保工ユニット10を設置する際に、鋼管矢板の内側に、弾性部材861を含む高さ調整部86を上面に有するブラケット本体82を設けた後、外側にスペーサを取付けた支保工ユニット10を鋼管矢板の内側で吊り降ろし、支保工ユニット10をブラケット本体82上に設置する。支保工ユニット10の設置時は、支保工ユニット10の吊り支持を解除する前に高さ調整部86の高さを調整して高さ調整部86が支保工ユニット10の下面に接するようにし、その後、支保工ユニット10の吊り支持を解除する。【選択図】図7
INSTALLATION METHOD OF TIMBERING
支保工の設置方法
AIRAKU SHOZO (author) / KOBAYASHI YUTAKA (author) / MUKAICHI KIYOSHI (author)
2019-01-17
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
TIMBERING INSTALLATION METHOD AND TIMBERING INSTALLATION DEVICE
European Patent Office | 2023
|SUPPORT BODY FOR TIMBERING, AND REMOVAL/INSTALLATION METHOD OF TIMBERING
European Patent Office | 2023
|FORMWORK TIMBERING METHOD AND FORMWORK TIMBERING STRUCTURE
European Patent Office | 2019
|