A platform for research: civil engineering, architecture and urbanism
To provide a junction structure in which a member for preventing leakage of an adhesive agent is not exposed, and a gap between a joint face of one wooden member and the joint face of the other wooden member is not widened.SOLUTION: In a junction structure, a pair of wooden members 10, 20 are jointed with each other via reinforcement bars 1 buried through the wooden members 10, 20. Reinforcement bar burying holes 12, 22 are drilled on joint surfaces 11, 21 of the wooden members 10, 20. The reinforcement bars 1 are inserted into the reinforcement bar burying holes 12, 22 and a compacted porous strip material 2 is arranged around the reinforcement bars 1 between the joint surfaces 11, 21 of the pair of wooden members 10, 20 to form an enclosure space 3. An adhesive agent is filled between outer peripheral surfaces of the reinforcement bars 1 and inner peripheral surfaces of the reinforcement bar burying holes 12, 22 and in the enclosure space 3, and hardened to bury the reinforcement bars 1.SELECTED DRAWING: Figure 1
【課題】 接着剤の漏れ出しを防止する部材が露出しないと共に、一方の木製部材の接合面と他方の木製部材の接合面間の隙間を徒に広げない接合構造の提供。【解決手段】 一対の木製部材10・20を該各木製部材10・20に亘って埋設される補強筋1を介して接合する接合構造であって、上記各木製部材10・20の接合面11・21に補強筋埋設用孔12・22をそれぞれ穿設し、該各補強筋埋設用孔12・22に上記補強筋1を挿入すると共に、上記一対の木製部材10・20の接合面11・21間において圧縮した多孔質条材2を上記補強筋1の周囲に配設して包囲空間3を形成し、上記補強筋1の外周面と上記各補強筋埋設用孔12・22の内周面間及び上記包囲空間3に接着剤を充填し硬化させて上記補強筋1を埋設する。【選択図】 図1
To provide a junction structure in which a member for preventing leakage of an adhesive agent is not exposed, and a gap between a joint face of one wooden member and the joint face of the other wooden member is not widened.SOLUTION: In a junction structure, a pair of wooden members 10, 20 are jointed with each other via reinforcement bars 1 buried through the wooden members 10, 20. Reinforcement bar burying holes 12, 22 are drilled on joint surfaces 11, 21 of the wooden members 10, 20. The reinforcement bars 1 are inserted into the reinforcement bar burying holes 12, 22 and a compacted porous strip material 2 is arranged around the reinforcement bars 1 between the joint surfaces 11, 21 of the pair of wooden members 10, 20 to form an enclosure space 3. An adhesive agent is filled between outer peripheral surfaces of the reinforcement bars 1 and inner peripheral surfaces of the reinforcement bar burying holes 12, 22 and in the enclosure space 3, and hardened to bury the reinforcement bars 1.SELECTED DRAWING: Figure 1
【課題】 接着剤の漏れ出しを防止する部材が露出しないと共に、一方の木製部材の接合面と他方の木製部材の接合面間の隙間を徒に広げない接合構造の提供。【解決手段】 一対の木製部材10・20を該各木製部材10・20に亘って埋設される補強筋1を介して接合する接合構造であって、上記各木製部材10・20の接合面11・21に補強筋埋設用孔12・22をそれぞれ穿設し、該各補強筋埋設用孔12・22に上記補強筋1を挿入すると共に、上記一対の木製部材10・20の接合面11・21間において圧縮した多孔質条材2を上記補強筋1の周囲に配設して包囲空間3を形成し、上記補強筋1の外周面と上記各補強筋埋設用孔12・22の内周面間及び上記包囲空間3に接着剤を充填し硬化させて上記補強筋1を埋設する。【選択図】 図1
JUNCTION STRUCTURE OF WOODEN MEMBER
木製部材の接合構造
KOSAKA YUJI (author)
2019-04-04
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
WOODEN MEMBER JUNCTION STRUCTURE AND WOODEN MEMBER JUNCTION METHOD
European Patent Office | 2023
|JUNCTION STRUCTURE FOR WOODEN MEMBER, AND JUNCTION METHOD FOR WOODEN MEMBER
European Patent Office | 2018
|JUNCTION STRUCTURE OF WOODEN MEMBER AND JUNCTION METHOD OF WOODEN MEMBER
European Patent Office | 2020
|