A platform for research: civil engineering, architecture and urbanism
UNIT BUILDING AND CONSTRUCTION METHOD OF UNIT BUILDING
To obtain a unit building and a construction method of a unit building which can be easily installed when installing a bridge beam between building units placed apart.SOLUTION: A bridge floor beam 20 is bridged between a building unit 12 and a building unit 14 placed apart, and brackets 56 are respectively coupled to both ends of the bridge floor beam 20. The bracket 56 can be hooked to a floor girder 32. Before fastening the bridge floor beam 20 to the floor girder 32, by coupling an end portion of the bridge floor beam 20 to the bracket 56, the bridge floor beam 20 can be hooked to the floor girder 32 via the bracket 56 and supported (temporarily set). That is, only by hooking the bracket 48 to the floor girder 32, the bridge floor beam 20 is supported, so that it is not necessary to support the bridge floor beam 20 from below when fastening the bridge floor beam 20 to the floor girder 32, and one person can do the fastening work.SELECTED DRAWING: Figure 7
【課題】離し置きされた建物ユニット間につなぎ小梁を設置する際に施工性がよいユニット建物及びユニット建物の施工方法を得る。【解決手段】離し置きされた建物ユニット12と建物ユニット14の間につなぎ床小梁20が架け渡されており、つなぎ床小梁20の両端部には、ブラケット56がそれぞれ結合されている。当該ブラケット56は、床大梁32に引っ掛け可能とされており、ブラケット56につなぎ床小梁20の端部を結合させることによって、つなぎ床小梁20を床大梁32に締結させる前に、ブラケット56を介してつなぎ床小梁20を床大梁32に引っ掛け、支持(仮置き)させることが可能となる。すなわち、ブラケット48を床大梁32に引っ掛けるだけで、つなぎ床小梁20は支持されるため、つなぎ床小梁20を床大梁32に締結させる際に、当該つなぎ床小梁20を下から支持する必要はなく、一人で締結作業を行うことができる。【選択図】図7
UNIT BUILDING AND CONSTRUCTION METHOD OF UNIT BUILDING
To obtain a unit building and a construction method of a unit building which can be easily installed when installing a bridge beam between building units placed apart.SOLUTION: A bridge floor beam 20 is bridged between a building unit 12 and a building unit 14 placed apart, and brackets 56 are respectively coupled to both ends of the bridge floor beam 20. The bracket 56 can be hooked to a floor girder 32. Before fastening the bridge floor beam 20 to the floor girder 32, by coupling an end portion of the bridge floor beam 20 to the bracket 56, the bridge floor beam 20 can be hooked to the floor girder 32 via the bracket 56 and supported (temporarily set). That is, only by hooking the bracket 48 to the floor girder 32, the bridge floor beam 20 is supported, so that it is not necessary to support the bridge floor beam 20 from below when fastening the bridge floor beam 20 to the floor girder 32, and one person can do the fastening work.SELECTED DRAWING: Figure 7
【課題】離し置きされた建物ユニット間につなぎ小梁を設置する際に施工性がよいユニット建物及びユニット建物の施工方法を得る。【解決手段】離し置きされた建物ユニット12と建物ユニット14の間につなぎ床小梁20が架け渡されており、つなぎ床小梁20の両端部には、ブラケット56がそれぞれ結合されている。当該ブラケット56は、床大梁32に引っ掛け可能とされており、ブラケット56につなぎ床小梁20の端部を結合させることによって、つなぎ床小梁20を床大梁32に締結させる前に、ブラケット56を介してつなぎ床小梁20を床大梁32に引っ掛け、支持(仮置き)させることが可能となる。すなわち、ブラケット48を床大梁32に引っ掛けるだけで、つなぎ床小梁20は支持されるため、つなぎ床小梁20を床大梁32に締結させる際に、当該つなぎ床小梁20を下から支持する必要はなく、一人で締結作業を行うことができる。【選択図】図7
UNIT BUILDING AND CONSTRUCTION METHOD OF UNIT BUILDING
ユニット建物及びユニット建物の施工方法
KANEKO SHOTA (author)
2019-06-06
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
BUILDING UNIT, UNIT BUILDING AND METHOD OF CONSTRUCTION OF UNIT BUILDING
European Patent Office | 2019
|BUILDING UNIT TRANSPORTATION METHOD, BUILDING UNIT AND UNIT BUILDING
European Patent Office | 2015
|UNIT WITH TEMPORARY SUPPORT MATERIAL, UNIT BUILDING, AND CONSTRUCTION METHOD FOR UNIT BUILDING
European Patent Office | 2017
|