BUILDING UNIT, UNIT BUILDING AND METHOD OF CONSTRUCTION OF UNIT BUILDING
To provide a building unit, a unit building, and a method for constructing a unit building in which temporary beams can be provided with a door provided.SOLUTION: A building unit (entrance unit 20) in which a skeleton body is formed by a plurality of beam materials (first floor girder 22, ceiling girder 25) and column material (column 21), comprises: a plurality of short beams (second floor girder 23, third floor girder 24) arranged at intervals at the position of one side where the beam of the skeleton body (first floor girder 22, ceiling girder 25) is arranged; and a detachable temporary beam (first temporary beams 31, second temporary beams 35) disposed between the short beams. The temporary beams (the first temporary beams 31 and the second temporary beams 35) are disposed inside the skeleton body, and a door (the entrance door 70) is disposed between the short beams.SELECTED DRAWING: Figure 9
【課題】 ドアを設けた状態で、仮梁を設けることができる建物ユニット、ユニット建物及びユニット建物の構築方法を提供する。【解決手段】 複数の梁材(第1床大梁22,天井大梁25)と柱材(柱21)とによって骨組体が形成された建物ユニット(玄関ユニット20)であって、骨組体の梁材(第1床大梁22,天井大梁25)が配置される一辺の位置において、間隔をおいて配置される複数の短梁(第2床大梁23,第3床大梁24)と、短梁間に配置され、着脱可能な仮梁(第1仮梁31,第2仮梁35)と、を備え、仮梁(第1仮梁31,第2仮梁35)は、骨組体の内側に配置され、短梁間には、ドア(玄関ドア70)が配置される。【選択図】図9
BUILDING UNIT, UNIT BUILDING AND METHOD OF CONSTRUCTION OF UNIT BUILDING
To provide a building unit, a unit building, and a method for constructing a unit building in which temporary beams can be provided with a door provided.SOLUTION: A building unit (entrance unit 20) in which a skeleton body is formed by a plurality of beam materials (first floor girder 22, ceiling girder 25) and column material (column 21), comprises: a plurality of short beams (second floor girder 23, third floor girder 24) arranged at intervals at the position of one side where the beam of the skeleton body (first floor girder 22, ceiling girder 25) is arranged; and a detachable temporary beam (first temporary beams 31, second temporary beams 35) disposed between the short beams. The temporary beams (the first temporary beams 31 and the second temporary beams 35) are disposed inside the skeleton body, and a door (the entrance door 70) is disposed between the short beams.SELECTED DRAWING: Figure 9
【課題】 ドアを設けた状態で、仮梁を設けることができる建物ユニット、ユニット建物及びユニット建物の構築方法を提供する。【解決手段】 複数の梁材(第1床大梁22,天井大梁25)と柱材(柱21)とによって骨組体が形成された建物ユニット(玄関ユニット20)であって、骨組体の梁材(第1床大梁22,天井大梁25)が配置される一辺の位置において、間隔をおいて配置される複数の短梁(第2床大梁23,第3床大梁24)と、短梁間に配置され、着脱可能な仮梁(第1仮梁31,第2仮梁35)と、を備え、仮梁(第1仮梁31,第2仮梁35)は、骨組体の内側に配置され、短梁間には、ドア(玄関ドア70)が配置される。【選択図】図9
BUILDING UNIT, UNIT BUILDING AND METHOD OF CONSTRUCTION OF UNIT BUILDING
建物ユニット、ユニット建物及びユニット建物の構築方法
KIKUCHI TAKASHI (author)
2019-04-25
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
BUILDING UNIT TRANSPORTATION METHOD, BUILDING UNIT AND UNIT BUILDING
European Patent Office | 2015
|FLOOR HEATING UNIT, BUILDING, UNIT BUILDING AND BUILDING UNIT
European Patent Office | 2018
|