SLIME TREATMENT METHOD IN CAST-IN-PLACE PILE CONSTRUCTION METHOD
To provide a slime treatment device in a cast-in-place pile construction method and a method thereof, capable of efficiently removing slime by coping with both of delivery time of requiring operability and winding time of requiring large hoisting force.SOLUTION: A slime treatment device is basically provided in a cast-in-place pile construction method for controlling in two stages of low pressure L when delivering F a mud lifting hose 30 caused by a descent of an underwater sand pump 100 into the underground hole and high pressure H when winding W of the underwater sand pump 100 in the underground hole, due to separating an installation place of the slime treatment device 1 by a constant distance from the muddy water surface of the underground hole, since the depth of the excavating underground hole is deep, the underground hole is excavated underground, or the slime treatment device 1 is installed in a place having a constant distance from an opening part of the underground hole and the muddy water surface.SELECTED DRAWING: Figure 1
【課題】操作性が要求される繰り出し時においても、又大きな巻上力が要求される巻き取り時の双方に対応することによって、スライムを効率的に除去することが可能な場所打ち杭工法におけるスライム処理装置及びその方法を提供する。【解決手段】掘削する地中孔の深さが深かったり、地中孔を地下に掘削したり、或いはスライム処理装置1を、地中孔の開口部や泥水面から一定距離を有する場所に設置することによって、スライム処理装置1の設置場所が地中孔の泥水面から一定距離離間していることに起因して、地中孔内への水中サンドポンプ100の下降に伴う揚泥ホース30の繰り出し時Fは低圧Lに、地中孔内における水中サンドポンプ100の巻き取り時Wは高圧Hの2段階に制御する場所打ち杭工法におけるスライム処理装置を基本として提供する。【選択図】図1
SLIME TREATMENT METHOD IN CAST-IN-PLACE PILE CONSTRUCTION METHOD
To provide a slime treatment device in a cast-in-place pile construction method and a method thereof, capable of efficiently removing slime by coping with both of delivery time of requiring operability and winding time of requiring large hoisting force.SOLUTION: A slime treatment device is basically provided in a cast-in-place pile construction method for controlling in two stages of low pressure L when delivering F a mud lifting hose 30 caused by a descent of an underwater sand pump 100 into the underground hole and high pressure H when winding W of the underwater sand pump 100 in the underground hole, due to separating an installation place of the slime treatment device 1 by a constant distance from the muddy water surface of the underground hole, since the depth of the excavating underground hole is deep, the underground hole is excavated underground, or the slime treatment device 1 is installed in a place having a constant distance from an opening part of the underground hole and the muddy water surface.SELECTED DRAWING: Figure 1
【課題】操作性が要求される繰り出し時においても、又大きな巻上力が要求される巻き取り時の双方に対応することによって、スライムを効率的に除去することが可能な場所打ち杭工法におけるスライム処理装置及びその方法を提供する。【解決手段】掘削する地中孔の深さが深かったり、地中孔を地下に掘削したり、或いはスライム処理装置1を、地中孔の開口部や泥水面から一定距離を有する場所に設置することによって、スライム処理装置1の設置場所が地中孔の泥水面から一定距離離間していることに起因して、地中孔内への水中サンドポンプ100の下降に伴う揚泥ホース30の繰り出し時Fは低圧Lに、地中孔内における水中サンドポンプ100の巻き取り時Wは高圧Hの2段階に制御する場所打ち杭工法におけるスライム処理装置を基本として提供する。【選択図】図1
SLIME TREATMENT METHOD IN CAST-IN-PLACE PILE CONSTRUCTION METHOD
場所打ち杭工法におけるスライム処理方法
NISHIUCHI IKUO (author)
2019-06-20
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
DEVICE AND METHOD FOR DISPOSAL OF SLIME IN CAST-IN-PLACE PILE CONSTRUCTION
European Patent Office | 2019
|METHOD FOR REMOVING SLIME IN CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2018
|DEVICE AND METHOD FOR DISPOSAL OF SLIME IN CAST-IN-PLACE PILE CONSTRUCTION
European Patent Office | 2019
|European Patent Office | 2024
|CAST-IN-PLACE PILE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
European Patent Office | 2023
|