To provide a means to improve a situation that conventional wave dissipation has involved constructing breakwaters that require large amount of concrete and/or piling up a large number of wave-dissipating blocks, taking long time for the construction works.SOLUTION: Weights are installed on the seabed at both sides of a body structure. The weights and float balls floating on the sea are connected. A rubber board attached with a plurality of float balls, and a box structure with slopes on both sides of it; both of which are meant for reducing the amplitude of waves; are connected to the firstly-said float balls to break waves. The aforesaid structure is fabricated in a factory and installed at site, enabling the reduction of the construction period.SELECTED DRAWING: Figure 2
【課題】従来の波消しは、大量のコンクリートを必要とする防波提や大量の波消しブロックを積み重ねなければならなかった。そのため工事期間も長くかかっていた。【解決手段】本体構造物の両サイドの海底に重りを説置し、その重りと海面に浮いている浮き玉と結び、その浮き玉と波を小さくするための複数の浮き玉がついたゴム板と両サイドに勾配をつけた箱形構造物を結び波を防ぐ、又構造物は工揚で作って現揚で説置して行くので工事期間は短く出来る。【選択図】図2
To provide a means to improve a situation that conventional wave dissipation has involved constructing breakwaters that require large amount of concrete and/or piling up a large number of wave-dissipating blocks, taking long time for the construction works.SOLUTION: Weights are installed on the seabed at both sides of a body structure. The weights and float balls floating on the sea are connected. A rubber board attached with a plurality of float balls, and a box structure with slopes on both sides of it; both of which are meant for reducing the amplitude of waves; are connected to the firstly-said float balls to break waves. The aforesaid structure is fabricated in a factory and installed at site, enabling the reduction of the construction period.SELECTED DRAWING: Figure 2
【課題】従来の波消しは、大量のコンクリートを必要とする防波提や大量の波消しブロックを積み重ねなければならなかった。そのため工事期間も長くかかっていた。【解決手段】本体構造物の両サイドの海底に重りを説置し、その重りと海面に浮いている浮き玉と結び、その浮き玉と波を小さくするための複数の浮き玉がついたゴム板と両サイドに勾配をつけた箱形構造物を結び波を防ぐ、又構造物は工揚で作って現揚で説置して行くので工事期間は短く出来る。【選択図】図2
WAVE DISSIPATION
波消し
AKAMINE HIROSHI (author)
2019-08-01
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Wave dissipation structure and fixed wave dissipation device
European Patent Office | 2024
|WAVE DISSIPATION BLOCK CONSTRUCTION METHOD THEREOF AND WAVE DISSIPATION CONSTRUCTORE
European Patent Office | 2023
|