A platform for research: civil engineering, architecture and urbanism
COMPACTION MANAGEMENT METHOD AND COMPACTION MANAGEMENT DEVICE
To provide a compaction control method preventing excessive improvement and allowing application of a compaction method to be efficiently performed.SOLUTION: A compaction device 1 in accordance with the present invention is provided parallely with a vibrator 3 including an electric eccentric motor applying vibration in a lateral direction, and a casing 5 supplying material in the underground so the eccentric motor is positioned at an under ground compaction point (expanding diameter point) upon construction. Then, as a current value of the motor (a load value on the motor) positioned at the under ground compaction point increases in accordance with a ground strength, the ground strength at a target depth is acquired from the current value of the motor. Also, the motor positioned at the compaction point generates vibration in the lateral direction. Namely, a condition of the ground may be estimated through load on the motor (i.e. the current value of the motor) because a direction to expand the ground in the lateral direction coincides with a direction of vibration generated by the vibrator 3. Further, parallely arranging the vibrator 3 and casing 5 prevents a lower end opening of the casing from being blocked by the vibrator.SELECTED DRAWING: Figure 1
【課題】過剰な改良を抑制し、締固め工法を効率良く施工することを可能にする締固め管理方法を提供する。【解決手段】本発明で用いる締固め装置1は、横方向の振動を与える電動の偏心モーターを含む振動機3と、材料を地中に供給するケーシング5を並設しているので、施工時に地中の締固め箇所(拡径箇所)に偏心モーターが位置する。そして、地中の締固め箇所に位置するモーターの電流値(モーターに対する負荷の値)は、地盤強度に応じて増加するので、モーターの電流値から対象深度における地盤強度を把握できる。また、締固め箇所に位置するモーターが横方向の振動を発生させる。すなわち、地盤を横方向に押し広げるときの方向と、振動機3による振動方向が一致するため、モーターに対する負荷(すなわちモーターの電流値)から地盤の状態を推定できる。また、振動機3とケーシング5を並設しているので、振動機がケーシングの下端開口部を遮ることがない。【選択図】図1
COMPACTION MANAGEMENT METHOD AND COMPACTION MANAGEMENT DEVICE
To provide a compaction control method preventing excessive improvement and allowing application of a compaction method to be efficiently performed.SOLUTION: A compaction device 1 in accordance with the present invention is provided parallely with a vibrator 3 including an electric eccentric motor applying vibration in a lateral direction, and a casing 5 supplying material in the underground so the eccentric motor is positioned at an under ground compaction point (expanding diameter point) upon construction. Then, as a current value of the motor (a load value on the motor) positioned at the under ground compaction point increases in accordance with a ground strength, the ground strength at a target depth is acquired from the current value of the motor. Also, the motor positioned at the compaction point generates vibration in the lateral direction. Namely, a condition of the ground may be estimated through load on the motor (i.e. the current value of the motor) because a direction to expand the ground in the lateral direction coincides with a direction of vibration generated by the vibrator 3. Further, parallely arranging the vibrator 3 and casing 5 prevents a lower end opening of the casing from being blocked by the vibrator.SELECTED DRAWING: Figure 1
【課題】過剰な改良を抑制し、締固め工法を効率良く施工することを可能にする締固め管理方法を提供する。【解決手段】本発明で用いる締固め装置1は、横方向の振動を与える電動の偏心モーターを含む振動機3と、材料を地中に供給するケーシング5を並設しているので、施工時に地中の締固め箇所(拡径箇所)に偏心モーターが位置する。そして、地中の締固め箇所に位置するモーターの電流値(モーターに対する負荷の値)は、地盤強度に応じて増加するので、モーターの電流値から対象深度における地盤強度を把握できる。また、締固め箇所に位置するモーターが横方向の振動を発生させる。すなわち、地盤を横方向に押し広げるときの方向と、振動機3による振動方向が一致するため、モーターに対する負荷(すなわちモーターの電流値)から地盤の状態を推定できる。また、振動機3とケーシング5を並設しているので、振動機がケーシングの下端開口部を遮ることがない。【選択図】図1
COMPACTION MANAGEMENT METHOD AND COMPACTION MANAGEMENT DEVICE
締固め管理方法および締固め管理装置
NIIZAKA TAKASHI (author) / TAKEDA KOZO (author) / SEKI MASANORI (author) / MOTOTANI YOJI (author) / NAKANISHI HOMARE (author) / MEGURIDA TAKASHI (author) / KIWAKI TARO (author) / ISHIDA SEIICHI (author) / AOKI MASAKI (author) / YUKAWA SEIJIRO (author)
2019-09-19
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|COMPACTION MANAGEMENT METHOD, AND COMPACTION MANAGEMENT SYSTEM
European Patent Office | 2020
|CONCRETE COMPACTION MANAGEMENT SYSTEM, AND CONCRETE COMPACTION MANAGEMENT METHOD
European Patent Office | 2023
|