A platform for research: civil engineering, architecture and urbanism
GUIDE WALL AND CONSTRUCTION METHOD OF GUIDE WALL
To provide a guide wall and like allowing construction to be easily performed in a short period and missing of stable solution to be prevented.SOLUTION: A guide wall 2 is formed by burying a steel plate 6 with legs in a ground improvement part 3. The ground improvement part 3 is formed to a predetermined depth from a ground surface by improving both sides of the ground 1 at a boring position 1a of a boring groove. The steel plate 6 with the legs comprises a steel plate 5, leg parts 7, anchor plates 11 and like. The steel plate 5 is a plate member in a general vertical direction buried along an extending direction of the boring position 1a at an end part of the boring position 1a at the ground improvement part 3.SELECTED DRAWING: Figure 1
【課題】短期間で容易に施工でき、安定液の逸水も防止できるガイドウォール等を提供する。【解決手段】ガイドウォール2は、地盤改良部3に脚付き鋼板6を埋設して形成したものである。地盤改良部3は、掘削溝の掘削位置1aの両側の地盤1を改良して地表面から所定の深さまで形成される。脚付き鋼板6は、鋼板5、脚部7、定着板11等を有する。鋼板5は、地盤改良部3の掘削位置1a側の端部で掘削位置1aの延長方向に沿って埋設された略鉛直方向の板材である。【選択図】図1
GUIDE WALL AND CONSTRUCTION METHOD OF GUIDE WALL
To provide a guide wall and like allowing construction to be easily performed in a short period and missing of stable solution to be prevented.SOLUTION: A guide wall 2 is formed by burying a steel plate 6 with legs in a ground improvement part 3. The ground improvement part 3 is formed to a predetermined depth from a ground surface by improving both sides of the ground 1 at a boring position 1a of a boring groove. The steel plate 6 with the legs comprises a steel plate 5, leg parts 7, anchor plates 11 and like. The steel plate 5 is a plate member in a general vertical direction buried along an extending direction of the boring position 1a at an end part of the boring position 1a at the ground improvement part 3.SELECTED DRAWING: Figure 1
【課題】短期間で容易に施工でき、安定液の逸水も防止できるガイドウォール等を提供する。【解決手段】ガイドウォール2は、地盤改良部3に脚付き鋼板6を埋設して形成したものである。地盤改良部3は、掘削溝の掘削位置1aの両側の地盤1を改良して地表面から所定の深さまで形成される。脚付き鋼板6は、鋼板5、脚部7、定着板11等を有する。鋼板5は、地盤改良部3の掘削位置1a側の端部で掘削位置1aの延長方向に沿って埋設された略鉛直方向の板材である。【選択図】図1
GUIDE WALL AND CONSTRUCTION METHOD OF GUIDE WALL
ガイドウォールおよびガイドウォールの構築方法
YASUNAGA MASAMICHI (author)
2019-10-31
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Guide wall construction method and guide wall construction structure
European Patent Office | 2020
|Steel guide wall for underground continuous wall and construction method of steel guide wall
European Patent Office | 2021
|Guide wall foundation groove and construction method of guide wall foundation groove
European Patent Office | 2020
|