A platform for research: civil engineering, architecture and urbanism
STRUCTURE OF SLOPE FRAME AND CONSTRUCTION METHOD THEREOF
To construct a slope frame in which a reinforcing bar is held at an accurate position and an accurate cross-sectional shape is formed.SOLUTION: A reinforcing bar support tool 1 is used which has a support part on the other end of a support 11 whose one end is formed as a driven part 14 to the underground, and has a stopper 13 perpendicular to the support 11 in the middle. The driven part 14 of the reinforcing bar support tool 1 is driven until the stopper 13 contacts a slope surface toward a direction perpendicular to the slope surface. The reinforcing bar is supported by the support of the reinforcement support tool 1. An arch-shaped shape display material 2 is installed in a state of covering the reinforcing bar group. Concrete 5 is sprayed in a state of covering the shape display material 2.SELECTED DRAWING: Figure 1
【課題】正確な位置に鉄筋が保持され、正確な断面形状を形成した法枠を構築する。【解決手段】一端を地中への打ち込み部14として形成した支柱11の他端に支持部を有し、中間には支柱11と直交するストッパ13を有する鉄筋支持具1を使用する。この鉄筋支持具1の打ち込み部14を法面に直交する方向に向けて、ストッパ13が法面に接触するまで打ち込む。その鉄筋支持具1の支持部で鉄筋を支持する。その鉄筋群を覆う状態で、アーチ状の形状表示材2を設置する。この形状表示材2を被覆する状態でコンクリート5などを吹き付けて行う。【選択図】図1
STRUCTURE OF SLOPE FRAME AND CONSTRUCTION METHOD THEREOF
To construct a slope frame in which a reinforcing bar is held at an accurate position and an accurate cross-sectional shape is formed.SOLUTION: A reinforcing bar support tool 1 is used which has a support part on the other end of a support 11 whose one end is formed as a driven part 14 to the underground, and has a stopper 13 perpendicular to the support 11 in the middle. The driven part 14 of the reinforcing bar support tool 1 is driven until the stopper 13 contacts a slope surface toward a direction perpendicular to the slope surface. The reinforcing bar is supported by the support of the reinforcement support tool 1. An arch-shaped shape display material 2 is installed in a state of covering the reinforcing bar group. Concrete 5 is sprayed in a state of covering the shape display material 2.SELECTED DRAWING: Figure 1
【課題】正確な位置に鉄筋が保持され、正確な断面形状を形成した法枠を構築する。【解決手段】一端を地中への打ち込み部14として形成した支柱11の他端に支持部を有し、中間には支柱11と直交するストッパ13を有する鉄筋支持具1を使用する。この鉄筋支持具1の打ち込み部14を法面に直交する方向に向けて、ストッパ13が法面に接触するまで打ち込む。その鉄筋支持具1の支持部で鉄筋を支持する。その鉄筋群を覆う状態で、アーチ状の形状表示材2を設置する。この形状表示材2を被覆する状態でコンクリート5などを吹き付けて行う。【選択図】図1
STRUCTURE OF SLOPE FRAME AND CONSTRUCTION METHOD THEREOF
法枠の構造とその構築方法
NISHIZONO KIYOSHI (author)
2020-01-30
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|SLOPE FRAME CONSTRUCTION METHOD AND SLOPE FRAME STRUCTURE FORMED USING THE SAME
European Patent Office | 2017
|SLOPE FRAME MOLDING MACHINE AND SLOPE FRAME CONSTRUCTION METHOD
European Patent Office | 2018
|FRAME, FRAME UNIT, MOLD FOR SLOPE FRAME, AND SLOPE FRAME CONSTRUCTION METHOD
European Patent Office | 2016
|SLOPE FRAME CONSTRUCTION METHOD USING STEEL SLOPE FRAME MEMBER
European Patent Office | 2019
|