CONNECTION STRUCTURE BETWEEN PILE HEAD OF READY-MADE PILE AND FOUNDATION FOOTING
To efficiently strengthen a pile head portion with a simple structure and effectively connect a ready-made pile to a foundation footing.SOLUTION: A ready-made pile 50 is buried in a pile hole 72, and a pile head portion 51 is exposed from a reference plane 70 to form a footing pile head embedded portion 54. Above the reference plane 70 is a footing body portion 54a. An anchor reinforcing bar is fixed to the pile head portion 51 by protruding upward so as to be located in the footing body portion 54a. An inner vertical main reinforcing bar 1, an outer vertical main reinforcing bar 11, an inner horizontal main reinforcing bar 5, an outer horizontal main reinforcing bar 15, and a shear strengthening reinforcing bar 41 are arranged around the pile head portion 51 in the footing pile head embedded portion 54. Around the pile head portion 51, a plurality of diagonal reinforcing bars 21, a plurality of sets of core reinforcing bars 31, 35, and a plurality of diagonal reinforcing bars 21 are arranged so as to be vertically overlapped. A connection structure 60 is configured by arranging the main reinforcing bars 61, 61 of a foundation beam in the footing body portion 54a.SELECTED DRAWING: Figure 1
【課題】単純な構造で効率よく杭頭部を強化して、既製杭と基礎フーチングとを有効に接続する。【解決手段】杭穴72内に既製杭50を埋設して、基準面70から杭頭部51を露出させてフーチング杭頭埋め込み部54を形成する。基準面70の上方はフーチング本体部54aとする。杭頭部51に、アンカー鉄筋をフーチング本体部54a内に位置するように上方に突出させて固定する。フーチング杭頭埋め込み部54内で杭頭部51の周囲に、内縦主鉄筋1、外縦主鉄筋11、内横主鉄筋5、外横主鉄筋15、せん断補強鉄筋41を配置する。杭頭部51の周囲に、複数段の斜め鉄筋21、複数段の1組みの中子鉄筋31、35、複数段の斜め鉄筋21を、上下に重なるように配置する。フーチング本体部54a内基礎梁の主鉄筋61、61を配置して、連結構造60を構成する。【選択図】図1
CONNECTION STRUCTURE BETWEEN PILE HEAD OF READY-MADE PILE AND FOUNDATION FOOTING
To efficiently strengthen a pile head portion with a simple structure and effectively connect a ready-made pile to a foundation footing.SOLUTION: A ready-made pile 50 is buried in a pile hole 72, and a pile head portion 51 is exposed from a reference plane 70 to form a footing pile head embedded portion 54. Above the reference plane 70 is a footing body portion 54a. An anchor reinforcing bar is fixed to the pile head portion 51 by protruding upward so as to be located in the footing body portion 54a. An inner vertical main reinforcing bar 1, an outer vertical main reinforcing bar 11, an inner horizontal main reinforcing bar 5, an outer horizontal main reinforcing bar 15, and a shear strengthening reinforcing bar 41 are arranged around the pile head portion 51 in the footing pile head embedded portion 54. Around the pile head portion 51, a plurality of diagonal reinforcing bars 21, a plurality of sets of core reinforcing bars 31, 35, and a plurality of diagonal reinforcing bars 21 are arranged so as to be vertically overlapped. A connection structure 60 is configured by arranging the main reinforcing bars 61, 61 of a foundation beam in the footing body portion 54a.SELECTED DRAWING: Figure 1
【課題】単純な構造で効率よく杭頭部を強化して、既製杭と基礎フーチングとを有効に接続する。【解決手段】杭穴72内に既製杭50を埋設して、基準面70から杭頭部51を露出させてフーチング杭頭埋め込み部54を形成する。基準面70の上方はフーチング本体部54aとする。杭頭部51に、アンカー鉄筋をフーチング本体部54a内に位置するように上方に突出させて固定する。フーチング杭頭埋め込み部54内で杭頭部51の周囲に、内縦主鉄筋1、外縦主鉄筋11、内横主鉄筋5、外横主鉄筋15、せん断補強鉄筋41を配置する。杭頭部51の周囲に、複数段の斜め鉄筋21、複数段の1組みの中子鉄筋31、35、複数段の斜め鉄筋21を、上下に重なるように配置する。フーチング本体部54a内基礎梁の主鉄筋61、61を配置して、連結構造60を構成する。【選択図】図1
CONNECTION STRUCTURE BETWEEN PILE HEAD OF READY-MADE PILE AND FOUNDATION FOOTING
既製杭の杭頭と基礎フーチングとの連結構造
MATSUDA TATSU (author) / MIZUSHIMA KOSUKE (author) / SHIRAISHI MASAHIRO (author) / MASUNAGA SHOTA (author)
2020-02-06
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|CONSTRUCTION METHOD OF PILE HEAD FOOTING AND PILE HEAD FOOTING STRUCTURE
European Patent Office | 2019
|PILE HEAD STABILIZATION MEMBER AND PILE FOUNDATION FOOTING STRUCTURE USING THE SAME
European Patent Office | 2017
|European Patent Office | 2016
|European Patent Office | 2016
|