THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
To provide a construction method and construction system capable of improving construction flexibility in a revolutionary manner.SOLUTION: A three-dimensional construction method includes: installing a first pulley 5A and second pulley 5B at a predetermined interval in an approximately horizontal direction of a structure; installing a first rope winding machine 4A and second rope winding machine 4B at positions lower by a predetermined distance than the structure; passing a first rope 3A and second rope 3B through the first and second pulleys, the first and second ropes having one ends connected to the first and second rope winding machines and the other ends connected to a worker 6's wearing tool; and controlling a sending-out and winding-up lengths and sending-out and winding-up speed of each of the first and second ropes of the first and second winding machines so that the worker can move to a desired position in a space defined using positions at which the first and second pulleys are installed and the structure's positions that each are in contact with the ground below the positions at which the first and second pulleys are installed.SELECTED DRAWING: Figure 1
【課題】施工自由度を画期的に向上することができる施工工法及び施工システムを提供する。【解決手段】三次元施工工法であって、構造物の略水平方向に所定の間隔をおいて、第1の滑車5A及び第2の滑車5Bを設置し、構造物の、所定の距離だけ下方の位置に、第1のロープ巻き取り機4A及び第2のロープ巻き取り機4Bを設置し、第1及び第2の滑車に第1のロープ3A及び第2のロープ3Bを通し、第1及び第2のロープの一端は、第1及び第2のロープ巻き取り機に接続され、他端は作業者6の着用具に接続され、第1及び第2の滑車が設置される位置、及び前記構造物の当該第1及び第2の滑車が設置される位置の下方において地面と各々接する位置で定義される空間において、所望の位置に作業者が移動可能なように、前記第1及び第2の巻き取り機の、前記第1及び第2のロープの送り出し及び巻き取り長さ、及び、送り出し及び巻き取り速度を制御する【選択図】図1
THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
To provide a construction method and construction system capable of improving construction flexibility in a revolutionary manner.SOLUTION: A three-dimensional construction method includes: installing a first pulley 5A and second pulley 5B at a predetermined interval in an approximately horizontal direction of a structure; installing a first rope winding machine 4A and second rope winding machine 4B at positions lower by a predetermined distance than the structure; passing a first rope 3A and second rope 3B through the first and second pulleys, the first and second ropes having one ends connected to the first and second rope winding machines and the other ends connected to a worker 6's wearing tool; and controlling a sending-out and winding-up lengths and sending-out and winding-up speed of each of the first and second ropes of the first and second winding machines so that the worker can move to a desired position in a space defined using positions at which the first and second pulleys are installed and the structure's positions that each are in contact with the ground below the positions at which the first and second pulleys are installed.SELECTED DRAWING: Figure 1
【課題】施工自由度を画期的に向上することができる施工工法及び施工システムを提供する。【解決手段】三次元施工工法であって、構造物の略水平方向に所定の間隔をおいて、第1の滑車5A及び第2の滑車5Bを設置し、構造物の、所定の距離だけ下方の位置に、第1のロープ巻き取り機4A及び第2のロープ巻き取り機4Bを設置し、第1及び第2の滑車に第1のロープ3A及び第2のロープ3Bを通し、第1及び第2のロープの一端は、第1及び第2のロープ巻き取り機に接続され、他端は作業者6の着用具に接続され、第1及び第2の滑車が設置される位置、及び前記構造物の当該第1及び第2の滑車が設置される位置の下方において地面と各々接する位置で定義される空間において、所望の位置に作業者が移動可能なように、前記第1及び第2の巻き取り機の、前記第1及び第2のロープの送り出し及び巻き取り長さ、及び、送り出し及び巻き取り速度を制御する【選択図】図1
THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
三次元施工工法及び三次元施工システム
MISAKI NOBORU (author)
2020-04-02
Patent
Electronic Resource
Japanese
THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
European Patent Office | 2020
|THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
European Patent Office | 2020
|THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
European Patent Office | 2020
|THREE-DIMENSIONAL CONSTRUCTION METHOD AND THREE-DIMENSIONAL CONSTRUCTION SYSTEM
European Patent Office | 2020
|