A platform for research: civil engineering, architecture and urbanism
STEEL PIPE COLUMN MEMBER FOR FILING CONCRETE AND CONSTRUCTION METHOD OF CONCRETE FILLED STEEL PIPE MEMBER
To provide a construction method of a concrete filled steel pipe member which keeps a concrete temperature equal to or more than a control predetermined temperature during and five days after filling concrete without arrangement of large-scale thermal insulation even when constructing the concrete filled steel pipe member in a cold season.SOLUTION: A steel pipe member 21 for filling concrete is a steel pipe member 21 provided with a column-beam joint portion 24 to which a steel beam 31 is connected, in which concrete 22 is filled, wherein an air duct 30 covering a steel pipe member 21 is arranged at a lower portion of the column-beam joint portion 24.SELECTED DRAWING: Figure 2
【課題】寒冷期にコンクリート充填鋼管柱を寒中施工する場合であっても、大掛りな断熱養生を行うことなく、コンクリート充填中および充填後5日間のコンクリート温度を管理設定温度以上に確保する。【解決手段】コンクリート充填用の鋼管柱材21は、鋼製梁31が接合される柱梁接合部24を備えてコンクリート22が充填される鋼管柱材21であって、柱梁接合部24の下方には、鋼管柱材21を覆う風管30が設置される。【選択図】図2
STEEL PIPE COLUMN MEMBER FOR FILING CONCRETE AND CONSTRUCTION METHOD OF CONCRETE FILLED STEEL PIPE MEMBER
To provide a construction method of a concrete filled steel pipe member which keeps a concrete temperature equal to or more than a control predetermined temperature during and five days after filling concrete without arrangement of large-scale thermal insulation even when constructing the concrete filled steel pipe member in a cold season.SOLUTION: A steel pipe member 21 for filling concrete is a steel pipe member 21 provided with a column-beam joint portion 24 to which a steel beam 31 is connected, in which concrete 22 is filled, wherein an air duct 30 covering a steel pipe member 21 is arranged at a lower portion of the column-beam joint portion 24.SELECTED DRAWING: Figure 2
【課題】寒冷期にコンクリート充填鋼管柱を寒中施工する場合であっても、大掛りな断熱養生を行うことなく、コンクリート充填中および充填後5日間のコンクリート温度を管理設定温度以上に確保する。【解決手段】コンクリート充填用の鋼管柱材21は、鋼製梁31が接合される柱梁接合部24を備えてコンクリート22が充填される鋼管柱材21であって、柱梁接合部24の下方には、鋼管柱材21を覆う風管30が設置される。【選択図】図2
STEEL PIPE COLUMN MEMBER FOR FILING CONCRETE AND CONSTRUCTION METHOD OF CONCRETE FILLED STEEL PIPE MEMBER
コンクリート充填用の鋼管柱材、及び、コンクリート充填鋼管柱の構築方法
OKUBO YOJI (author) / ORITO ICHIRO (author) / OKUYAMA KAZUHIRO (author) / SHOJI DAIKI (author)
2018-12-27
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2019
|CONSTRUCTION METHOD FOR STEEL PIPE COLUMN MEMBER AND CONCRETE FILLING STEEL PIPE COLUMN
European Patent Office | 2018
|CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
European Patent Office | 2020
|