A platform for research: civil engineering, architecture and urbanism
PRECAST FLOOR SLAB CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a precast floor slab connection structure and connection method capable of improving the strength of a connection part while reducing costs.SOLUTION: A connection structure for connecting an adjacent first precast floor slab 1 and a second precast floor slab 2 includes: a first hook part 12 formed at each tip of a plurality of first main reinforcements 11 protruding from the first precast floor slab 1; a second hook part 22 formed at each tip of a plurality of second main reinforcements 21 protruding from the second precast floor slab 2; a first distributing bar 13 fixed to the first hook part 12; and a second distributing bar 23 fixed to the second hook part 22. The first distributing bar 13 is fixed while being in contact with the horizontal inner edge of the first hook part 12 and the second distributing bar 23 is fixed while being in contact with the horizontal inner edge of the second hook part 22.SELECTED DRAWING: Figure 1
【課題】連結部の強度を向上させつつコストダウンを図ることができる、プレキャスト床版の連結構造及び連結方法を提供する。【解決手段】隣接する第一プレキャスト床版1及び第二プレキャスト床版2を連結する連結構造は、第一プレキャスト床版1から突出した複数の第一主鉄筋11の各先端に形成された第一フック部12と、第二プレキャスト床版2から突出した複数の第二主鉄筋21の各先端に形成された第二フック部22と、第一フック部12に固定される第一配力筋13と、第二フック部22に固定される第二配力筋23と、を含み、第一配力筋13は、第一フック部12の水平方向内縁部に接触した状態で固定され、第二配力筋23は、第二フック部22の水平方向内縁部に接触した状態で固定されている。【選択図】図1
PRECAST FLOOR SLAB CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a precast floor slab connection structure and connection method capable of improving the strength of a connection part while reducing costs.SOLUTION: A connection structure for connecting an adjacent first precast floor slab 1 and a second precast floor slab 2 includes: a first hook part 12 formed at each tip of a plurality of first main reinforcements 11 protruding from the first precast floor slab 1; a second hook part 22 formed at each tip of a plurality of second main reinforcements 21 protruding from the second precast floor slab 2; a first distributing bar 13 fixed to the first hook part 12; and a second distributing bar 23 fixed to the second hook part 22. The first distributing bar 13 is fixed while being in contact with the horizontal inner edge of the first hook part 12 and the second distributing bar 23 is fixed while being in contact with the horizontal inner edge of the second hook part 22.SELECTED DRAWING: Figure 1
【課題】連結部の強度を向上させつつコストダウンを図ることができる、プレキャスト床版の連結構造及び連結方法を提供する。【解決手段】隣接する第一プレキャスト床版1及び第二プレキャスト床版2を連結する連結構造は、第一プレキャスト床版1から突出した複数の第一主鉄筋11の各先端に形成された第一フック部12と、第二プレキャスト床版2から突出した複数の第二主鉄筋21の各先端に形成された第二フック部22と、第一フック部12に固定される第一配力筋13と、第二フック部22に固定される第二配力筋23と、を含み、第一配力筋13は、第一フック部12の水平方向内縁部に接触した状態で固定され、第二配力筋23は、第二フック部22の水平方向内縁部に接触した状態で固定されている。【選択図】図1
PRECAST FLOOR SLAB CONNECTION STRUCTURE AND CONNECTION METHOD
プレキャスト床版の連結構造及び連結方法
KISAKU TOMOAKI (author) / YOSHIDA YUKI (author) / NAKAMURA YOSHIHIKO (author)
2020-08-20
Patent
Electronic Resource
Japanese
PRECAST FLOOR SLAB CONNECTION STRUCTURE, PRECAST FLOOR SLAB SYSTEM, AND BRIDGE STRUCTURE
European Patent Office | 2016
|PRECAST CONCRETE FLOOR SLAB CONNECTION STRUCTURE AND CONNECTION METHOD
European Patent Office | 2019
|PRECAST CONCRETE FLOOR SLAB CONNECTION STRUCTURE AND CONNECTION METHOD
European Patent Office | 2019
|WATERPROOF STRUCTURE OF PRECAST FLOOR SLAB AND CONNECTION STRUCTURE OF PRECAST FLOOR SLAB
European Patent Office | 2024
|PRECAST FLOOR SLAB INSTALLATION JIG AND PRECAST FLOOR SLAB CONNECTION METHOD
European Patent Office | 2024
|