To provide an anchor bolt construction jig which can improve the position accuracy of anchor bolts buried and fixed in concrete foundations and reduce construction time.SOLUTION: A construction jig 10 of anchor bolts 2 includes: a pair of receiving tools 11 provided with an inner wall mounting part 12 mounted on inner wall surfaces 53 of a pair of side wall parts 5A, 5B facing each other in a formwork 5 and a receiving part 13 projecting inward of the formwork 5 with the inner wall mounting parts 12 mounted on the inner wall surfaces 53; and an anchor plate 15 that holds the anchor bolts 2 in a suspended state and is supported and fixed to each receiving part 13 of the receiving tools 11. A fixture 20 is inserted and fixed through a first through hole 13a formed in the receiving part 13 of the receiving tools 11 and a second through hole 16 formed in the anchor plate 15.SELECTED DRAWING: Figure 3
【課題】コンクリート基礎に埋設固定されるアンカーボルトの位置精度を高めることができ、施工時間を短縮できるアンカーボルトの施工治具を提供する。【解決手段】アンカーボルト2の施工治具10は、型枠5の対向する一対の側壁部5A、5Bの内壁面53に取付けられる内壁取付部12と、内壁取付部12が内壁面53に取付けられた状態で、型枠5の内方に突出した受け部13と、を備えた一対の受け具11と、アンカーボルト2を吊下げた状態で保持し、受け具11の各受け部13に支持固定されるアンカープレート15と、を備える。受け具11の受け部13に形成された第1貫通孔13aと、アンカープレート15に形成された第2貫通孔16に固定具20を挿通して固定する。【選択図】図3
ANCHOR BOLT CONSTRUCTION JIG AND FOUNDATION FORMWORK STRUCTURE
To provide an anchor bolt construction jig which can improve the position accuracy of anchor bolts buried and fixed in concrete foundations and reduce construction time.SOLUTION: A construction jig 10 of anchor bolts 2 includes: a pair of receiving tools 11 provided with an inner wall mounting part 12 mounted on inner wall surfaces 53 of a pair of side wall parts 5A, 5B facing each other in a formwork 5 and a receiving part 13 projecting inward of the formwork 5 with the inner wall mounting parts 12 mounted on the inner wall surfaces 53; and an anchor plate 15 that holds the anchor bolts 2 in a suspended state and is supported and fixed to each receiving part 13 of the receiving tools 11. A fixture 20 is inserted and fixed through a first through hole 13a formed in the receiving part 13 of the receiving tools 11 and a second through hole 16 formed in the anchor plate 15.SELECTED DRAWING: Figure 3
【課題】コンクリート基礎に埋設固定されるアンカーボルトの位置精度を高めることができ、施工時間を短縮できるアンカーボルトの施工治具を提供する。【解決手段】アンカーボルト2の施工治具10は、型枠5の対向する一対の側壁部5A、5Bの内壁面53に取付けられる内壁取付部12と、内壁取付部12が内壁面53に取付けられた状態で、型枠5の内方に突出した受け部13と、を備えた一対の受け具11と、アンカーボルト2を吊下げた状態で保持し、受け具11の各受け部13に支持固定されるアンカープレート15と、を備える。受け具11の受け部13に形成された第1貫通孔13aと、アンカープレート15に形成された第2貫通孔16に固定具20を挿通して固定する。【選択図】図3
ANCHOR BOLT CONSTRUCTION JIG AND FOUNDATION FORMWORK STRUCTURE
アンカーボルトの施工治具および基礎型枠構造物
YOO DONG-YEON (author) / MORIKAWA KATSUHIRO (author) / SUZUKI KINYA (author)
2020-10-08
Patent
Electronic Resource
Japanese
ANCHOR BOLT CONSTRUCTION JIG AND BASIC FORMWORK STRUCTURE
European Patent Office | 2020
|European Patent Office | 2023
|European Patent Office | 2020
|