OUTER WALL INSTALLATION STRUCTURE OF BUILDING
To improve workability of a fireproof coating material mainly.SOLUTION: The invention relates to an outer wall installation structure of a building 1 in which an outer wall material 3 of a lower floor 2 and an outer wall material 5 of an upper floor 4 are installed vertically on an outer surface of the building 1 and the outer wall material 3 of the lower floor 2 and the outer wall material 5 of the upper floor 4 are mounted on a beam 6 situated between the lower floor 2 and the upper floor 4 using a stud material 8 of the lower floor 2 and a stud material 9 of the upper floor 4 extending in a vertical direction 7 respectively. A fireproof coating material 41 is installed on at least an outside part and a top part of the beam 6. A raising piece 42 higher than a thickness of the fireproof coating material 41 is mounted on the top part of the beam 6. The stud material 9 of the upper floor 4 is mounted on a top surface part 46 of the raising piece 42.SELECTED DRAWING: Figure 1
【課題】主に、耐火被覆材の作業性を向上し得るようにする。【解決手段】建物1の外面に、下階2の外壁材3と上階4の外壁材5とが上下に設置され、下階2の外壁材3および上階4の外壁材5は、下階2と上階4との間に位置する梁6に、上下方向7へ延びる下階2のスタッド材8および上階4のスタッド材9を用いてそれぞれ取付けられている建物1の外壁設置構造に関する。梁6の少なくとも外側部および上部に耐火被覆材41が設置されている。梁6の上部に耐火被覆材41の厚みよりも高い嵩上げピース42が取付けられている。上階4のスタッド材9は、嵩上げピース42の上面部46に取付けられている。【選択図】図1
OUTER WALL INSTALLATION STRUCTURE OF BUILDING
To improve workability of a fireproof coating material mainly.SOLUTION: The invention relates to an outer wall installation structure of a building 1 in which an outer wall material 3 of a lower floor 2 and an outer wall material 5 of an upper floor 4 are installed vertically on an outer surface of the building 1 and the outer wall material 3 of the lower floor 2 and the outer wall material 5 of the upper floor 4 are mounted on a beam 6 situated between the lower floor 2 and the upper floor 4 using a stud material 8 of the lower floor 2 and a stud material 9 of the upper floor 4 extending in a vertical direction 7 respectively. A fireproof coating material 41 is installed on at least an outside part and a top part of the beam 6. A raising piece 42 higher than a thickness of the fireproof coating material 41 is mounted on the top part of the beam 6. The stud material 9 of the upper floor 4 is mounted on a top surface part 46 of the raising piece 42.SELECTED DRAWING: Figure 1
【課題】主に、耐火被覆材の作業性を向上し得るようにする。【解決手段】建物1の外面に、下階2の外壁材3と上階4の外壁材5とが上下に設置され、下階2の外壁材3および上階4の外壁材5は、下階2と上階4との間に位置する梁6に、上下方向7へ延びる下階2のスタッド材8および上階4のスタッド材9を用いてそれぞれ取付けられている建物1の外壁設置構造に関する。梁6の少なくとも外側部および上部に耐火被覆材41が設置されている。梁6の上部に耐火被覆材41の厚みよりも高い嵩上げピース42が取付けられている。上階4のスタッド材9は、嵩上げピース42の上面部46に取付けられている。【選択図】図1
OUTER WALL INSTALLATION STRUCTURE OF BUILDING
建物の外壁設置構造
SUZUKI RYOICHI (author)
2020-12-10
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
INSTALLATION ELEMENT FOR OUTER WALL AND OUTER WALL STRUCTURE
European Patent Office | 2018
|ACCESSORY FOR JOINT AND INSTALLATION STRUCTURE OF BUILDING OUTER WALL
European Patent Office | 2022
|European Patent Office | 2024
|