A platform for research: civil engineering, architecture and urbanism
BUILDING CONSTRUCTION METHOD, AND TEMPORARY STRUCTURE USED IN BUILDING CONSTRUCTION METHOD
To provide a building construction method improving a workability and to provide a temporary structure used in a building construction method.SOLUTION: A building construction method utilizes a panel attaching tool 1 used in attaching a building panel 30 to a building body B. The building construction method comprises: a step of attaching a plurality of panel attaching tools 1 to a beam B1 of the building body B with an interval in a direction of an opening of the building body B; a step of attaching a temporary handrail 20 to an attaching hole 3 for attaching the building panel 30 in the panel attaching tool 1; a step of detaching the temporary handrail 20 from the attaching hole 3; and a step of attaching the building panel 30 to the attaching hole 3. In the step of attaching the temporary handrail 20, the temporary handrail 20 extending in the opening direction is attached to the plurality of panel attaching tools 1 disposed with the interval in the direction of the opening, so as to be supported.SELECTED DRAWING: Figure 1
【課題】施工性向上を図った建物施工方法及び建物施工方法に用いる仮設構造体を提供する。【解決手段】建物本体Bに建築用パネル30を取り付ける際に用いられるパネル取り付け具1を利用した建物施工方法である。当該建物施工方法では、建物本体Bの梁B1に、建物本体Bの間口方向に間隔を空けてパネル取り付け具1を複数取り付ける工程と、パネル取り付け具1において建築用パネル30を取り付けるための取り付け穴3に対し仮設手摺り20を取り付ける工程と、取り付け穴3から仮設手摺り20を取り外す工程と、取り付け穴3に対し建築用パネル30を取り付ける工程と、を備えている。上記仮設手摺り20を取り付ける工程では、間口方向に間隔を空けて配置された複数のパネル取り付け具1に対し、間口方向に延びた仮設手摺り20を支持させるように取り付ける。【選択図】図1
BUILDING CONSTRUCTION METHOD, AND TEMPORARY STRUCTURE USED IN BUILDING CONSTRUCTION METHOD
To provide a building construction method improving a workability and to provide a temporary structure used in a building construction method.SOLUTION: A building construction method utilizes a panel attaching tool 1 used in attaching a building panel 30 to a building body B. The building construction method comprises: a step of attaching a plurality of panel attaching tools 1 to a beam B1 of the building body B with an interval in a direction of an opening of the building body B; a step of attaching a temporary handrail 20 to an attaching hole 3 for attaching the building panel 30 in the panel attaching tool 1; a step of detaching the temporary handrail 20 from the attaching hole 3; and a step of attaching the building panel 30 to the attaching hole 3. In the step of attaching the temporary handrail 20, the temporary handrail 20 extending in the opening direction is attached to the plurality of panel attaching tools 1 disposed with the interval in the direction of the opening, so as to be supported.SELECTED DRAWING: Figure 1
【課題】施工性向上を図った建物施工方法及び建物施工方法に用いる仮設構造体を提供する。【解決手段】建物本体Bに建築用パネル30を取り付ける際に用いられるパネル取り付け具1を利用した建物施工方法である。当該建物施工方法では、建物本体Bの梁B1に、建物本体Bの間口方向に間隔を空けてパネル取り付け具1を複数取り付ける工程と、パネル取り付け具1において建築用パネル30を取り付けるための取り付け穴3に対し仮設手摺り20を取り付ける工程と、取り付け穴3から仮設手摺り20を取り外す工程と、取り付け穴3に対し建築用パネル30を取り付ける工程と、を備えている。上記仮設手摺り20を取り付ける工程では、間口方向に間隔を空けて配置された複数のパネル取り付け具1に対し、間口方向に延びた仮設手摺り20を支持させるように取り付ける。【選択図】図1
BUILDING CONSTRUCTION METHOD, AND TEMPORARY STRUCTURE USED IN BUILDING CONSTRUCTION METHOD
建物施工方法及び建物施工方法に用いる仮設構造体
HAYASHI TEPPEI (author) / MINAMINO TAKAHIRO (author) / OYAMA MAKOTO (author) / MATSUBARA SATOSHI (author) / ASANO SHOHEI (author)
2021-04-08
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
BUILDING CONSTRUCTION METHOD AND TEMPORARY STRUCTURE USED FOR BUILDING CONSTRUCTION METHOD
European Patent Office | 2021
|TEMPORARY STRUCTURE, TEMPORARY STRUCTURE ASSEMBLY STRUCTURE AND BUILDING CONSTRUCTION METHOD
European Patent Office | 2022
|Temporary drainage structure for building engineering construction
European Patent Office | 2024
|Temporary drainage structure for building engineering construction
European Patent Office | 2024
|